My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09209
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09209
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:58 PM
Creation date
10/12/2006 3:31:16 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.750
Description
San Juan River General
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
7/3/1945
Author
BOR
Title
Report of Proceedings of Meeting Related to Projects of the United States Bureau of Reclamation in San Juan Basin - Colorado and New Mexico - July 3 1945
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />003288 <br /> <br />-13- <br /> <br />in oourt Was his only reoourse. <br /> <br />~he ,ne~t area under disoussion was the Piedra and the <br />vers in ~otiuletaand Hinsdale Counties. Colorado. <br /> <br />1 <br />'I <br />1 <br />, <br /> <br />; <br />Se.n Juan Itt.. <br />{ <br /> <br /> <br /> <br />, i <br />Mf.Dailey W. Hott, a Direotor of the Southwestern Water (Jonser..; . " <br />vanoy Disltriot from Arohuleta County, gave the following informationl ~ti, <br />our need~ are a number of small projeots. and that no one large projeo~i <br />oould seI'!1e the entire oommunity. ' <br /> <br /> <br />. <br /> <br />~orandum Statement by Mr. Hott followsl <br /> <br />PROPOSED RECLAMATION PROJECTS FOR ARCHULETA <br />__......____ _____....r_.______~._.~ <br />Q2..UNTY, .E2_YOTE PARIC AND 110NTEZ~_C~ AREAS <br />I <br /> <br />,A. There are approximately 40 miles of main and dis- <br />tt:l.bJ1tion oanals from Big Navajo Hiver. There are storage <br />pQss1bilit:l.es on bothCoyo'be Creek and Little Navajo Hiver. <br /> <br />,B. Approximatelyl500 aores of farm and pasture land <br />oan be irrigated under this projeot. <br /> <br />C, T~re is also a possibility of enlarging Bucles <br />Ujketofu11llish water for Coyote Creek. <br /> <br />II <br /> <br />M~LL.CREEKI <br />--------- <br />: :A. There is a small dam and ,approximately 10 miles of <br />D1'Vel'sion and Distribution Canals for supplemental water for <br />l500'aores of farming pasture land. <br /> <br />III <br /> <br />FOllRMlLE & TURKEY CREBK LAKESI <br />--+--....---...,..-_.....~ --...-----.- <br /> <br />. <br /> <br />A. Raising present outlets to enlarge oapaoity. <br /> <br />B. ~arging present diversion ditohes to furnish sup- <br />plellle;o:bal water for 600 aores faI'llling and acres of neW faI'lll- <br />, " - - <br />inl';ap.d pasture land. <br /> <br />~ <br /> <br />IV <br /> <br />D~TOp P~I (Covers muoh of Four lule Projects) <br /> <br />, pam and 7 miles feeder oanals plus diversion and distri- <br />bu}10n oanals. <br /> <br />15,000 aores of new faI'llling and irrigated pasture land <br /> <br />, <br />;.at' "lJ <br /> <br />, <br />J; :.:1.-.". Jt, <br /> <br />. ..,_.., <br />,',;,-,.,,-<,- <br /> <br />- 'c_. <br />_.,..v~__., _ <br /> <br />"-~~ -- -~~--'-"---' <br /> <br />,- -,.~ <br /> <br />;: <br /> <br />, <br />,'. <br />,'j- <br />
The URL can be used to link to this page
Your browser does not support the video tag.