My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09201
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09201
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:54 PM
Creation date
10/12/2006 3:31:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.112.A
Description
Dallas Creek Participating Project
State
CO
Basin
Gunnison
Water Division
4
Date
2/4/1982
Author
USDOI-BOR
Title
Ridgway Dam/Dallas Creek Project Status
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />0r ..a- <br />~ <br /> <br />. <br /> <br />REPORT OF BUREAU OF RECLAMATION <br />UPPER COLORADO REGION <br />COLORADO WATER CONSERVATION BOARD <br />GRAND JUNCTION. COLORADO <br />FEBRUARY 4. 1982 <br /> <br />RIDGWAY DAM. DALLAS CREEK PROJECT <br /> <br />STATUS <br />ALL LAND PURCHASES NECESSARY FOR CONSTRUCTION AND OPERATION <br />OF RIDGWAY DAM HAVE BEEN COMPLETED AND RELOCATION OF HIGHWAYS <br />AND UTILITIES IS COMPLETE. <br /> <br />STAGE I DAM CONSTRUCTION IS 94% COMPLETE (DEC. 31). AND WAS <br />SCHEDULED FOR COMPLETION IN NOVEMBER 1981. <br /> <br />A CARPENTERS STRIKE. A CONSTRUCTION WORKERS' STRIKE. AND A <br />TEAMSTERS UNION PICKET LINE SLOWED PROGRESS. THE SLOW DOWNS <br />CAUSED THE PHASE I CONTRACT TO GO INTO NEXT SPRING. <br /> <br />RIDGWAY DAM. STAGE I WHICH INCLUDES EXCAVATION OF THE DAM FOUNDATION. <br />FOUNDATION TREATMENT. REFILL OF THE CUTOFF TRENCH TO ORIGINAL GROUND <br />SURFACE AND CONSTRUCTION OF THE RIVER OUTLET CONDUIT. GATE CHAMBER <br /> <br />. <br />AND STILLING BASIN IS ESSENTIALLY COMPLETE. Two CONCRETE PLACEMENTS <br />REMAIN TO BE PLACED IN THE GATE CHAMBER. SOME ZONE 1 AND ZONE 3 FILL <br />REMAINS TO BE PLACED IN THE OUTLET WORKS AREA OF THE DAM AND SOME <br />BACKFILL AROUND THE STILLING BASIN IS NOT COMPLETE. IT IS ANTICIPATED <br />THAT APPROXIMATELY ONE MONTHS' WORK REMAINS WHICH WILL BE COMPLETED AS <br />SOON AS THE WEATHER MODERATES. <br />- " <br />
The URL can be used to link to this page
Your browser does not support the video tag.