My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09200
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09200
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:53 PM
Creation date
10/12/2006 3:31:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8503.400.B
Description
Costilla Creek/Rio Grande Basin
Basin
Rio Grande
Water Division
3
Date
5/2/1974
Title
Report of Engineer Advisors to the Costilla Creek Compact Commission - May 2 1974 - REPORT OF DELIVERIES
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />-:::t" <br />00 <br />~ <br />..... <br /> <br />ESTIMATED SAFE YIELD COSTILLA RESERVOIR SYSTEM <br />1974 IRRIGATION SEASON <br /> <br />'-' <br /> <br />'....~ <br /> <br />Measured water content Culebra Snow Course April 1, 1974 7.2 in. <br />Measured water content Red River Snow Course, April 1, 1974 6.0 in. <br />Average water content Culebra and Red River 6.6 in. <br />Estimated May-Sept. runoff at Canyon Mouth 11,700 AF <br />Estimated Storage in Costilla Reservoir April 30, 1974 8,000 AF <br />Estimated Safe Yield May l6-Sept. 30 11,600 AF <br /> <br />,- <br /> <br />\ <br />
The URL can be used to link to this page
Your browser does not support the video tag.