My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09191
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09191
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:49 PM
Creation date
10/12/2006 3:30:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.760
Description
Yampa River General
State
CO
Basin
Yampa/White
Water Division
6
Date
1/23/1992
Author
Various
Title
Yampa River Feasibility Study - News Articles-Press Releases - January 1992 through January 1993
Water Supply Pro - Doc Type
News Article/Press Release
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
24
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />NORTHWEST GOLO~DO <br /> <br />Deily Press <br /> <br /> ';;) <br /> Colorado ~ <br /> Press , <br /> BEST AD ::,.,) <br />. OF YEAR -.1 <br /> 1991 c.:::> <br /> 7NN~~ <br /> <br /> <br />I 1111 <br />o 1992 Yompa Valley NlIWI Po~lnc. <br /> <br />~-'f~. '1;-~~: ":"'v~f'ii" ':':~::i~:?rif~~1~~''';~:~:::': "T:/:~:}7iff#.'$1.ffi":::':L' ";5: <br /> <br />Elkhead enlargement plilps probed <br /> <br /> <br />By CHUCK HOOK valley is ahesdy being irrigat.ed, so " .. ..'; <br />Staff writer that demand for irrigation water <br />CRAIG - PlllIlll to quadruple the would remain coDStant_ <br />size of Elkhead R.eservoir to ensure The two-year long study eom- <br />future water supplies and provide pared five different dam sites off <br />recreation in northwest Colorado the mainatem of the Yampa River: <br />drew positive comments at a meet- enlarging Elkhead from 13,000 <br />ing Wednesday night here_ acre feet to 52,000 acre feet, enllU'g- <br />While plans show it is possible, . ing Stagecoach from 33,000 acre <br />and would help e,ndangered fish in feet to .52,000 acre feet, a new <br />the Yampa River, objections sur- 70,000 acre foot capacity dam <br />[aced to giving away the all water above Hamilton on the Williams <br />rights held for the long dormantJu- Fork or on the East Fork of <br />niper dams. The objections are ex- Willi-amB Fork, and_ another, new' <br />pected to be thoroughly aired today dam (which would require pump- <br />during a meeting o[ the Colorado ing) on Elk Greek between Hayden <br />River Water Conservation District, and Steamboat Springs. <br />which owns the conditional water Goals of the model were to use <br />. rights to the dams_ the Juniper storage rights to create <br />If Elkhead is not enllU'ged, there enough additional reservoir sthr- <br />would be little shortage of water on age to satisfy all needs through <br />the Yampa until the year 2040, ae- 2040 while;leaVing the rest of the <br />cording to calculations by Chuck water in the.Yainpa to help endan- <br />Brendeeke of Hydrosphere, a con- gered species, said Ray Thnney, a <br />sultant working for the river dis- CRWCD employee heading up the <br />triel_ study_ <br />Those shortages might be Nearly all water needs could he <br />"paper' shortages - the model creat- met in 2040 by enlarging Elkhead <br />ed assumed the valley would have a and Stagecoach. The model set the <br />population of roughly 167,000 pea- recreation pool i.n Elkhead at <br />pie and that a coal-gasification 39,000 acre feet. <br />plant would be operating_ It also as- But the model merely shows that <br />sumed that all irrigible land in the the idea of enlarging Elkhead is <br /> <br />;.;)): <br />'~.:'~: <br /> <br />. . . Preupholo",RoyN" r <br />DIac:ussl. ons about the Vampa River diversion are just part 01 the agenda of the Colorado River Water. <br />COIisemilIciil D1s1rtct, In town this week. <br /> <br />possible. Political issues like for the legal and construction costs River District's 15-member board <br />whether or not the River District of the project, and whetber it is members must .veigh in deciding <br />. wants to abandon its right to Ju- legally possible to convert the Ju- . whether or not to go any furtber <br />niper dllll1,..what the plan's impact niper conditional storage decrees to with the project, said Thnney, <br />would ba ~ Colorado's ability to an instream flow_ are still up for de- "People are starting to take it as <br />use the wawin the Yampa!t is en- bate_ a given and there are still a lot of <br />titled to by compact, who would pay . Those sre some of the laetprs the pitfalls along the way; he stressed_ <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.