Laserfiche WebLink
<br />. <br /> <br />018:2 <br /> <br />Economic and Financial Analyses <br /> <br />or flood control storage. The same allowances for sediment and dead <br />and inactive storage were used as in the multiple-purpose reservoir. <br />Flood routing studies were made to determine spillway and surcharge <br />capacities. Reconnaissance cost estimates, including cost estimates <br />for relocations, rights-of-way, clearing, etc., are SUTIIDlarized in <br />table 26 for each alternative. <br /> <br />Table 26.--Single-purpose irrigation and flood <br />control alternatives <br /> <br />($1,000) <br /> <br />Item <br /> <br />Irrigation Flood <br />control <br />4423.5 4438.0 <br />462,785 637 ,160 <br />$45,427 $51,401 <br />11,189 13,961 <br />15,659 17,079 <br />781 897 <br />290 305 <br />17,476 19,127 <br />32 32 <br />110 110 <br />1,388 1,388 <br />46,925 52,899 <br />3,876.4 3,876.4 <br />50,801.4 56,775.4 <br />.1,352.3 1,352-3 <br />$52,153.7 $58,127.7 <br /> <br />Dam crest elevation - feet <br /> <br />. <br /> <br />Initial storage capacity - ac.-ft. <br /> <br />Project costs <br />Dam and reservoir <br />Land and rights <br />Relocations <br />Clearing lands <br />Structures and improvements <br />Dams <br />Miscellaneous equipment <br />General property <br />Fish and wildlife mitigation <br />Total project costs <br />Interest during construction <br />Total capital cost <br /> <br />Capitalized OM&R * <br /> <br />Total alternative costs <br /> <br />*Annual OM&R of $44,300 ($26,300 dam and reservoir and $lB,ooo <br />mitigation).capitalized for 100 years at 3-1/8 percent interest. <br /> <br />. <br /> <br />91 <br />