My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09144
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09144
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:33 PM
Creation date
10/12/2006 3:29:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8510.100.60
Description
Rio Grande Compact Commission
Basin
Rio Grande
Water Division
3
Date
1/1/1948
Title
Tenth Annual Report of the Rio Grande Compact Commission 1948
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
46
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />"':1' <br />,~ <br />0J <br />"'~ <br />(,.) <br />r..~ <br /> <br />.....,..- <br /> <br />(Continued) <br /> <br />Intermediate qUEntities shall <br />be computed by proportional parts <br /> <br />(5) The Otowi Index Supply is the recorded fl"", of t.he Rio Grande <br />at the U.S.G.S. gaging station at otowi Bridge near Ssn Ilde- <br />fonso (formerly station near Buckman) duriilg the calendar year, <br />corrected for the operation of reservoirs constructed after <br />1929 in the drainage basin of the Rio Grande betveen Lobatos <br />and Otowi Bridge. <br /> <br />(6) Elephant Butte Effective Index Supply is the recorded flow of <br />th.. Rio Grande at the gaging station below Elephant Butte Dam <br />during the calendar year plus the net gain in storage in Ele- <br />phant Butte Reservoir durinli the same year or minus the net <br />loss in storage in said reservoir, as the case 'may be. <br /> <br />The application of this schedule shall be subject to the pro- <br />visions hereinafter set forth and appropriate adjustments shall <br />be made for (a) any chBIlge in location of gaging stations; <br /> <br />(b) Depletion after 1929 in New Mexico of the natural nIDoff <br />at otowi bridge; and (c) any transmountain diversions into the <br />Rio Grande between Lobatos and Elephant Butte I\eservoir". <br /> <br />Be It Further Resolved: <br /> <br />That the gaging stations at San Acacia and San Marcial be and the <br />same are hereby abandoned for Compact purposes. <br /> <br />Be It Further Resolved: <br /> <br />That this Resolution has been passed unan1Jnously and shall be ef- <br />fective JanUllI'Y 1, 1949, if within 120 days from this date the Com- <br />missioner for each State shall have received from the Attomey Gen- <br />eral of the state represented by hilll, an opinion approving this Re- <br />solution, end shall have so advised theChainDan of the Commission, <br />otherwise, to be of no force and effect. <br /> <br />PurSU&nt to said Resolution, the opinions of the Attomeys General of the re- <br />spective states were sought and received within the period of t1Jne specified by <br />the Resolution. It having been concluded by each of the Attomeys General that <br />the substitutions of stations F.nd measurements of deliveries by New Mexico set <br />forth in said Resolution were within the powers of the Commission, said sub- <br />stitutions of stations and measurements became effective on January 1, 1949. <br />
The URL can be used to link to this page
Your browser does not support the video tag.