My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09138
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:29 PM
Creation date
10/12/2006 3:28:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.100
Description
Miscellaneous Small Projects and Project Studies - NRCS-Ft Lyon Canal Co Limestone Graveyard Creeks
State
CO
Basin
Arkansas
Water Division
2
Date
10/26/1992
Author
Gronning Engineering
Title
Plan of Study Ft Lyon Canal Company
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />m <br /> <br />0302 <br /> <br />John R. Clark, r.E. <br />Project Manager <br />Page 2 <br /> <br />M & I Consulting Engineers - Oc[Ober 1975 to December 1981 <br />Fon Collins, Colorado <br />Project engineer and project manager <br />Emphasis on water/wastewater projects of all kinds <br /> <br />Lounsbury and Associates, Consultants - 1971 to 1974 <br />Land development and municipal utilities design <br />Anchorage, AJaska <br /> <br />U.S. Navy - 1966 [0 1971 <br />lieutenant, Civil Engineer Corps (Sea bees) <br />Construction engineering, public works management and leadership. <br /> <br />Representative Colorado Projects: <br /> <br />WATER TRANSMISSION LINES AND PLANT IMPROVEMENTS n Project Engineer and Resident <br />Engineer for $1.2 M project for City of Canon City, Colorado. <br /> <br />HORSETOOTH WATER SERVICE COMMISSION n Report on Feasibility of a Regional Water Treannem <br />and Transmission Systp.m (projected project :n three phases to 80 mgd for about $52 million) for <br />Loveland. Colorado; <br /> <br />WATER TREATMENT PLANT AND TRANSMISSION LINE ANALYSIS -, Project Engineer (covering <br />phased plant expansion to 30 mgd for $4 million) for City of Loveland, Cdorado. <br /> <br />WATER DISTRIBUTION SYSTEM AND TRANSMISSION LINES; WATER TREATMENT PLANT (5 mgd) <br />for $4.33 million (Federal grar.ts) project for City of Rocky Ford, Colorado. <br /> <br />WASTEWATER TREATMENT PLANT -- Design Engineer for $5.0 million project for Upper Eagle Valley <br />Sanitation Dismct, Avon, Colorad<>. <br /> <br />WATER TRANSMISSION LINES AND WELL DEVELOPMENT AND WASTEWATER TREATMENT PLANT - <br />, Project Engineer and Resident for Water Transrnission Lines and Well Development and Design <br />Engineer for Wastewater Treannent Plant (3.4 mgd) for $7.3 million project for Vail Water and <br />Sanitation Dismcr in Vail, Colorado. <br /> <br />WASTEWATER POND IMPROVEMENTS AND INTERCEPTOR LINES -- Project Engineer and Principal <br />Designer for $1.1 million project for Weld County Tri-Area Sanitation Disnict, Frederick, Colorado. <br /> <br />PRELIMINARY SEWER SYSTEM REPORT -- Project Engineer and Principal Investigator (recommended <br />line improvements to $1.8 million project development now underway) for City of Lafayette, Colorado. <br /> <br />WATER AND WASTEWATER SYSTEMS n Geologic, soils, Jnd drainage investigation and design of <br />systems for retreat camp of 200 persons. $200,000 project for Meadowdale Ranch, Estes Park, <br />Colorado. <br />
The URL can be used to link to this page
Your browser does not support the video tag.