My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09122
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP09122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:11 PM
Creation date
10/12/2006 3:28:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.100
Description
Section D General Studies-Power
Date
1/1/1981
Author
DOI
Title
Dunham Point-Peaking Power Unit-Plan of Study-Colorado River Storage Project Power Peaking Capacity
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER VII <br />AUTHORIZATION AND PRECONSTRUCT ION ACTIVITIES <br /> <br />. <br /> <br />Assumin~ that the study identified a course of action that meets the <br /> <br />tests of acceptability, effectiveness. efficiency. ana completeness, it <br /> <br />is ~i1(.elv that authorization fot' construction would he sou~ht. The usual <br /> <br />procedure would be for the Presioent to suhmit t~P.: n~ports to Congress, <br /> <br />afteT completion of t~e reviewi.n~ p,.-oc.ess out1.i.ned in C~a'Pter V. wi tll ::J <br /> <br />recommendation for aut~o~ization. Any memher of Con~re~~ cou1~ also enter <br /> <br />a bl.11. for aut~o['ization. Ordinari.1y tl,e autl-tori.zat~.on prOCp.Rs would ta1{e <br /> <br />a minimum of two years after the filin~ of tl,e final envi.ronfllenta1 <br /> <br />statem~nt. <br /> <br />After 8utl-}orl..zation and wl,en aopr.onriations "ecome availah~e for arl- <br /> <br />vanced planning, detailed advance planning 5tud~es must he connucted hy <br /> <br />Water and Power he fore actual construction can begin. rl,eqe ~tud':ies wi 11 <br /> <br />a~sure that t~e unit plan is up-to-date and adequate for a1~ tec~nica' <br /> <br />disciplines involved. T~ev will culminate with tl,e preparation of a n~fi- <br /> <br />nite plan report ,....l,l.cl, will Sp.Tve 8!; the hasie guide for tl,e DrOper ano <br /> <br />orderlv development of the prciect and will. p,-ovide the hasi.c information <br /> <br />. <br /> <br />prerequisite <br /> <br />foT:' <br /> <br />agreements. <br /> <br />land acquisition, and initiation of <br /> <br />speci.fications designs. <br /> <br />Upon approval of the definitp. plan report "y the r.ornmi.sioner of Water <br /> <br />ann Power. and appropriation of funding l:ly ~ongr.ess. fjl1al prf':parati.ons for <br /> <br />construction can he~in. Specification desi2ns can rye orepar~d, lann can <br /> <br />he acqui~en. necessa-rv nonconstruction agreements can hp. negot~ate~. and <br /> <br />contracts can he awarded for actual construction. <br /> <br />. <br /> <br />31) <br />
The URL can be used to link to this page
Your browser does not support the video tag.