My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09122
CWCB
>
Water Supply Protection
>
DayForward
>
1-1000
>
WSP09122
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 8:52:11 PM
Creation date
10/12/2006 3:28:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8040.100
Description
Section D General Studies-Power
Date
1/1/1981
Author
DOI
Title
Dunham Point-Peaking Power Unit-Plan of Study-Colorado River Storage Project Power Peaking Capacity
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
55
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />anotl1er for the environmental statement. Some of tt,e steps co;ncl.r'e or <br /> <br />overlap. As t~e reviewing process pto~resses, <br /> <br />the titles of the dual <br /> <br />. <br /> <br />reports will c~an~e. Tl1e title c~anges an~ prescri~ed review times are <br /> <br />indicated in t~e follow~ng summary of t~e review process. <br /> <br />Tne first drafts of the dual reports. referreo to as Pield nrafts of <br /> <br />the Pl.annin~ Report arid Draft Envir,.,nmental Statement. I.T; I 1 he prepared hv <br /> <br />tl-te Durango Projects Office of the Yo/ater and Power R.p.SOUl"ces Ser.vice in <br /> <br />Durango. ColorAdo. ann suhmitted to t~e Uppp.r rolorado R~gional Office tn <br /> <br />Salt Lake Citv, <br /> <br />for review. <br /> <br />Tlle dr<'l.fts will be. revi sed a~ necessarv <br /> <br />tl,rougl-t a cooperati.ve effor.t bv tl-tese t"yO offices. <br /> <br />The dual reports will then ~e identified as the Regional Office D~afts <br /> <br />of the Report and Draft Env;ronmental <br /> <br />Statement. At t~is step. thp'v,...ill <br /> <br />he reviewed 51mul.taneouslv by tl,e. planning team ann ot~er interesten <br /> <br />parties as determined ~y t~e Regional Directo~. r.o~ments from tl-t;s revie~' <br /> <br />. <br /> <br />wi1' be con~iderecl. and. furtl-ter rp.vi.slons wi.l1 ;e made if appropri.ate. <br /> <br />The c1ua 1 <br /> <br />reports ~,i l' <br /> <br />t~en he desiRnate~ tl-tp Rp.Rional Director'q <br /> <br />Proposed Re?ort and Advance Draft EnV1rnnmenta1 Statement and fo'!"'~aroed to <br /> <br />tl,e Commissioner's Offi.ce of tl,e ~-J'ater and Power Resources Ser1Y;.ce in <br /> <br />Wa9~ington. D.C.. and t~e Engineering ann Researc~ r.enter i~ Denvp.r. <br /> <br />r.oloraClo. for revie"y. <br /> <br />This reVlew ~a~ no prpdetp.rmined prescribed time <br /> <br />period; ~oweveT, in circulatin~ t"te report for In-~ouse rev1.ew, a d.ate for <br /> <br />receivinR comments i~ esta~'i~hen. <br /> <br />After incorpor,!ltion bv tl,e regional office of any t:'es1l1ting cotmnents. <br /> <br />t"'te i1ual. reports as revised will become t'le ~p'Q';.nn;:!l Director-Is Report an<1 <br /> <br />Draft Environmental <br /> <br />Statement. <br /> <br />Upon return of tl,p report <br /> <br />to th e <br /> <br />Wa~l,ington Office for furt'ler proces~in~. <br /> <br />it wi" be re'easen to t~e <br /> <br />appropriate Con~'!"'ess{onal r1elp.gat~ons as a p~e1iml.narv nocument fo~ tl,~ <br /> <br />. <br /> <br />members' information. <br /> <br />". <br /> <br />0,19 <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.