My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09111
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09111
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:19 PM
Creation date
10/12/2006 3:28:05 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8141.600.20
Description
Fryingpan-Arkansas Project - Studies - Environmental Studies
State
CO
Basin
Arkansas
Water Division
5
Date
7/1/2000
Author
US DoI BoR
Title
Final Environmental Assessment Finding of No Significant Impact Pueblo Dam and Reservoir Fryingpan-Arkansas Project Pueblo Colorado
Water Supply Pro - Doc Type
EIS
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />~ <br /> <br /> <br />0272 <br /> <br />IN REPLY <br />REFER TO: <br /> <br />BUREAU OF RECLAMATION <br />Eastern Colorado Area Office <br />11056 West County RD 18E <br />Loveland, Colorado 80537-9711 <br /> <br /> <br />United States Department of the Interior <br /> <br />EC-1350 <br />ENV-6,OO <br /> <br />Jl21aro <br /> <br />1 <br />,j <br />jl To: <br />II From: <br />II Subject: <br /> <br />MEMORANDUM <br /> <br />Interested Parties <br />(See Attached Distribution List) ) , ;if <br /> <br />~erald Kelso, Acting Area Manager LK 9 PI <br /> <br />Finding of No Significant Impact and Environmental Assessment (Assessment) for a <br />contract with the Board of Water Works of Pueblo (Board). <br /> <br /> <br />I <br />< <br /> <br />Attached for your information is a copy of the Finding of No Significant Impact (FONS!) for a contract <br />between the Bureau of Reclamation (Reclamation) and the Pueblo Board of Water Works to: <br /> <br />.1 <br />l; <br /> <br />. Store up to 15,000 acre-feet per year of non-project water in Pueblo ReselVoir on an "if and <br />when" basis. <br />Connect a 84" pipe to the South Outlet Works of Pueblo Dam to convey water from Pueblo <br />ReselVoir to the Board's Comanche Pump Station and a 78" pipeline from the pump station to the <br />Whitlock Water Treatment Plant. <br />Place an 84" pipeline across Reclamation property along the alignment shown on Figure 2. <br /> <br />'1 <br /> <br />This FONSI is based on an environmental assessment, prepared by the Reclamation, which evaluated the <br />effects of the proposed project, mitigation measures that will be implemenied, and environmental <br />commitments made by the Board, The environmental commitments and mitigation outlined in the FONS! <br />will minimize the environmental effects of the project to the point that Reclamation believes there will be <br />no significant impact on the human environment. The FONSI is being distributed to each agency, group, <br />or individual that received a copy of the draft Assessment. For those who submitted comments on the <br />draft assessment, a copy of the final assessment is also included with this letter, Copies of the final <br />assessment are also being distributed to libraries in Pueblo, <br /> <br />!fyou have any questions or would like a copy of the final assessment, please contact <br />Mr, Will Tully at (970) 962-4368, <br /> <br />Attachment <br /> <br />cc: Terry Book, Board of Water Works of Pueblo, 319 West Fourth Street, P.O, Box 400, Pueblo, <br />CO 81002 <br />
The URL can be used to link to this page
Your browser does not support the video tag.