My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09110
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:18 PM
Creation date
10/12/2006 3:28:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.102.03.I
Description
Colorado River Water Projects - Aspinall Storage Unit - Morrow Point - Environmental Studies
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
9/1/2001
Author
DOI-BOR
Title
Morrow Point Cimarron River Dredging Project - Final Environmental Assessment and Finding of No Significant Impact
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />OOJ8~6 <br /> <br />Cimarron Dred~in~ Environmental Assessment <br /> <br />with the CDOW. increased turbidity in Crystal that may occur as a result as a function of the <br />dredging project is not predicted to adversely affect the fisheries in Crystal. CDOW's concerns <br />focused around limiting the amount of suspended sediments being deposired in the Gunnison <br />River below Crystal: therefore. water quality issues were focused below Crystal. Preliminary <br />water quality data has been added to the Appendices. <br /> <br />Comment 3: Page 4, paragraph 4. Land and Facilities Resources: Will the road be closed to the <br />public during the entire two-month dredging process. or just during the 6 hour per day that <br />dredging activities are taking place? <br /> <br />Response: Traffic control measures (signing. flagging. and road closures) will be used to address <br />public safety issues associated with the narrow road and haul trucks. When equipment and <br />loaded trucks are using the road. the road will be closed to the public. When hauling is not <br />occuring. the road will be open to the public. <br /> <br />Comment 4: Page 5. Paragraph 2. last sentence: should "read...which represents about $98.539 <br />per ~ in power revenues." <br /> <br />Response: "year" was added. <br /> <br />Comment 5: Paragraph 4: Where is the "off-site" storage area? Do the impacts associated with <br />the off-site storage area need to be evaluated" <br /> <br />Response: The Colorado Department of Transponation will provide the off-site storage area and <br />impacrs associated with the olf-site storage area need to be evaluated. It is anticipated that the <br />gravel will be stored at an existing COOT storage site. however, if a new storage site is <br />developed. appropriated NEPA compliance would be needed. <br /> <br />Comment 6: Page 6, Statement 3: Should you be minimizing negative effects to trout resourses <br />"within" as well as below Crystal Reservoir. <br /> <br />Response: Concerns identified associated with trout resources focused around sediments being <br />deposited in the Gunnison River affecting trout spawning success. Trout do not spawn in Crystal <br />Reservoir. Temporary changes in water quality in Crystal as a result of the dredging is not <br />predicted to adversely affect trout resources in Crystal. <br /> <br />Comment 7: Page 9. Paragraph 9, Sentence I: should read "in conjunction with the construction <br />of the Aspinall Unit. <br /> <br />Response: "the" was added. <br /> <br />Comment 8: Page 9, Paragraph 5, Sentence I: should read ..... below the Black Canyon of the <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.