Laserfiche WebLink
<br />Ofj30:~3 <br /> <br />THE IMPACT O~ THE ADDITION or PROJECT WATER TO THE ORIGINAL WATER SuPPLY FOR THE <br /> <br />DISTRICT AREA IS CLEARLY EVIDENT FROM THE ABOVE DATA. <br /> <br />By APPLYING A LITTLE ARITHMETIC TO <br /> <br />. <br /> <br />THE BASIC r/GURES IN THE TABULATION1 THE FOLLOWING INTERESTING RELATIONSHIPS CAN BE DERIVED: <br /> <br />1928-1937 <br />AI,IGE. A.F. <br /> <br />1958- 1967 <br />AVGE:. A.F. <br /> <br />FOR EACH ACRE-rOOT or TOTAL PRIMARY WATER SUPPLY: <br /> <br />TOTAL DIVERSIONS IN DISTRICT= <br />SURFACE DIVERSIONS IN DISTRICT= <br />GROUND WATeR PUMPAGe:= <br />TOTAL RETURN fLOW= <br />RETURN FLOW RE-USED IN DISTRICT= <br />OUTFLOW TO NEBRASKA= <br />CONSUMFTiVE USE= <br /> <br />2.2 <br />2.1 <br />.1 <br />1.5 <br />1.2 <br />.3 <br />.7 <br /> <br />2.5 <br />1.5 <br />1.0 <br />1.8 <br />1.5 <br />.3 <br />.7 <br /> <br />FOR EACH ACRE-FOOT OF INCREASED PRIMARY SuPPLY: <br /> <br />~ <br /> <br />TOTAL DIVERSIONS INCLUDING OUTFLOW INCREASED <br />TOTAL DIVERSIONS WITHIN DISTRICT INCREASED <br />SURFACE DIVERSIONS WITHIN DISTRICT DECREASED <br />GROUND WATER PUMPAGt INCREASED <br />TOTAL RETURN FLOW INCREASED <br />CONSUMPTIVE USE INCREASED <br />OUTFLOW TO NEBRASKA INCREASED <br /> <br />3.8 <br />3.3 <br />.1 <br />3.4 <br />2.8 <br />.4 <br />.5 <br /> <br />., <br /> <br />THESE FIGURES SHOW THAT TOTAL WATER USCAG' IN TH' DISTRJCT INCREASED ).3 ACRE-FEET <br /> <br />FOR EACH ACRE-FOOT or INCREASED PRIMARY SUPPLY. OUTFLOW TO NEBRASKA WAS ALSO INCREASED <br /> <br />BY ONE-HALF ACRE-FOOT FOR EACH ACRE-FOOT OF INCREASED SUPPLY. <br /> <br />NOT ALL of THE INCREASED <br /> <br />USE CAN BE ATTRIBUTED TO PROJECT DELIVERIES, OF COURSE; BUT MUCH OF IT CAN BE. TOTAL USE <br /> <br />IN THE 1928-1937 PERIOD AVERAGED 2.2 TIMES THE PRIMARY SUPPLY. <br /> <br />THEREFORE. r TIS SAf"E TO <br /> <br />SAY THAT AT LEAST 2.2 uSES HAVE BEEN MADE OF PROJECT WATER DELIVERED. ON THIS BASIS. THE <br /> <br />AVERAGE, ANNUAL TOTAL USAGE ATTRIBUTABLE TO PROJECT WATER IS AT LEAST 526.000 ACRE-FEET. <br /> <br />THIS SHOWS THAT THE ORIGINAL PURPOSE FOR THE CREATION OF THE DISTRICT AND FOR THE CONSTRUC- <br /> <br />TION OF THE COLORADO-BIG THOMPSON PRO~ECT IS BEING LARGELY FULFILLED. <br /> <br />. <br /> <br />. <br /> <br />-5- <br />