Laserfiche WebLink
<br />Executive Summary <br />DEIS - Navajo Reservoir Operations <br /> <br />5-21 <br /> <br /> <br />Comparison of Aiternatives <br /> <br />Table 5-5 summarizes the impacts associated with each alternative retained for detailed <br />analysis. <br /> <br />, <br /> <br /> 250/5000 (Flow <br /> Recommendations) <br />Resource No Action Alternative Alternative 500/5000 Alternative <br />Navajo Reservoir Reservoir operated for Reservoir operated Reservoir operated for <br />operations and content flood control and existing for flood control. flood control and <br /> uses; average July endangered fish, full endangered fish, <br /> content 1.52 million NIIP water supply; potential shortage to <br /> acre.feet. average July content NIIP water supply; <br /> 1.35 million acre-teet. average July content <br /> t.30 million acre-teet. <br />San Juan River monthly Minimum flow 500 cfs; Minimum flow 250 cfs; Minimum flow 500 cfs; <br />flows at Archuleta (near Average annual flow of Average annual flow of Average annual flow of <br />dam) 1,015 cfs; average July 775 cfs; average July 780 cfs; average July <br /> flow 1,050 cfs; average flow 385 cfs; average flow 540 cfs; average <br /> January flow 880 cfs. January flow 300 cfs January flow 500 cfs. <br />San Juan River monthly Minimum flow 65 cfs; Minimum flow 500 cfs; Minimum flow <100 cfs <br />flows at Bluff, Utah Average annual flow of Average annual flow of when reservoir storage <br /> 1,900 cfs; average June 1,670 cfs; average June exhausted; average <br /> flow 4,250 cfs; average flow 4,680 cIs; average annual flow of 1,670 cIs; <br /> August flow 1,570 cfs. August flow 1,110 cts. average June flow <br /> 4,110 cfs; average <br /> August flow 1,170 cfs. <br />Water uses and Water supply adequate Water supply adequate Water supply adequate <br />resources to meet existing uses; to meet existing uses; to meet existing uses <br /> future water uses completion of NflP and with possible additional <br /> including NIIP ALP Project would shortages in dry years; <br /> completion and ALP occur. Best opportunity completion of NIIP and <br /> Project assumed not to to accomplish future ALP Project included <br /> occur. water development. with possible shortages. <br />Indian Trust Assets/ Two types of ITA's Two types of ITA's Two types of ITA's <br />Environmental Justice potentially affected-- potentially affected- potentially affected-- <br /> water uses and cultural water uses and cultural water uses and cultural <br /> resources on trust lands. resources on trust lands. resources on trust lands. <br /> Least opportunity for Positive impacts to all Shortages to water <br /> development of water Tribes by protecting projects would Occur and <br /> uses. water development that better chance for future <br /> has ESA and NEPA water development than <br /> compliance-allows best No Action. <br /> possibility for future <br /> water development. <br /> <br />Table S-5-Summary comparison of altematives retained for further analysis <br /> <br />00582 <br />