Laserfiche WebLink
<br />In <br />'<7' <br />'<::l" <br />~ <br />o <br />~, a <br /> <br />9 <br /> <br />Article III also contains a very important prohibition concerning <br />water quality ,which could prevent Colorado from utilizing water drained <br />from the Closed Basin to fulfill its delivery requirements to New Mexico. <br />For all such works constructed after 1937, Colorado shall not be credited <br /> <br />with the amount of water so de livered, un I ess the proport ion of sodi um ions <br /> <br />shall be less than forty-five percent of the total Positive ions in the <br /> <br />water anytime the total dissolved sol ids in such water exceeds three <br /> <br />hundred fifty parts per million. <br />Article IV established a schedule which contains the relationship <br /> <br />between quantities of water measured at one gauging station on the Rio <br />Grande River, the Otowi Bridge gauging station in New Mexico, and the <br /> <br />, amount of water which should flow past the San Marcial Index Station in <br />New Mexico. As in Article III, adjustments are permitted in the schedule <br />to reflect depletions in the amount of water passing the Otowi Bridge <br />Index Station due to diversions of the natural runoff after 1929 in New <br /> <br />Mexico and also for depletions during the months of July, August and Sep- <br />tember of the runoff .of tributaries between the Otowi Bridge Index Station <br />and the San Marcial Index Station by works constructed after 1937. An <br />adjustment must also be made for new water transported into the drainage <br /> <br />basin from an outside source. A resolution was adjusted, effective Jan- <br /> <br />uary 1, 1949, chan9ing the schedules set out in Article IV, to relate <br /> <br />to Otowi supply to the Elephant Butte effective supply, instead of the <br /> <br />San Marcial gauge. The resolution also eliminated the San Marcial and <br /> <br />San Acacia gauging stations and removed the depletions Occurring in July, <br /> <br />August and September from the accounting systems. <br />In accordance with the theory of Article III, the purpose of the sched- <br />ule is to establish the relationship between the amount of water passing <br /> <br />. .. ~ <br />