Laserfiche WebLink
<br /> <br />TABLE OF CONTENTS (CONTINUED) <br /> <br /> ~ <br /> 5.1.4 Evaluation Criteria 5-4 <br /> 5.1.4.1 Investment Costs 5-4 <br /> 5.1.4.2 Annual Costs 5-6 <br /> 5.1.4.3 Revenues 5-6 <br /> 5.2 ECONOMICS . . . . . 5-6 <br /> 5.2.1 Cost of Firm Yield 5-6 <br /> 5.2.2 Marginal Cost of Firm Yield 5-8 <br /> 5.2.3 Sensitivity Analysis 5-9 <br /> 5.2.4 Potential Benefits 5-9 <br /> 5.2.4.1 Water Supply 5-9 <br /> 5.2.4.2 Recreation 5-10 <br /> 5.2.4.3 Improved Water Quality 5-11 <br /> 5.2.4.4 Reduced Road Costs 5-11 <br /> 5.2.4.5 Hydropower 5-11 <br /> 5.2.4.6 Flood Control 5-12 <br /> 5.2.4.7 Other Benefits 5-12 <br /> 5.3 FINANCIAL EVALUATION , 5-12 <br /> 5.3.1 Construction Schedule 5-12 <br /> 5.3.2 Investment Cost 5-12 <br /> 5.3.3 Annual Costs 5-15 <br /> 5.3.3.1 Debt Service 5-15 <br /> 5.3.3.2 Operation and Maintenance 5-16 <br /> 5.3.3.3 Interest on Reserve Funds 5-16 <br /> 5.3.3.4 Total Annual Cost 5-17 <br />6.0 REFERENCES . . . 6-1 <br />7.0 GLOSSARY . . . , 7 -1 <br />8.0 ACRONYMS AND ABBREVIATIONS 8- 1 <br /> <br />v <br />