My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09090
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09090
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:10 PM
Creation date
10/12/2006 3:27:09 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8273.100.10
Description
Colorado River Basin Salinity Control - Federal Agency Reports - BOR
Basin
Colorado Mainstem
Water Division
5
Date
2/1/1996
Title
CRBSCP - Report to Congress on the Bureau of Reclamation Basinwide Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />f\:J <br />~ <br />.....t <br />OJ <br /> <br />Summary <br /> <br />collectively evaluate and rank the proposals, The ranking committee <br />representatives from the Federal Government and the Colorado River Basin <br />States (Wyoming, Utah, Colorado, California, Nevada, New Mexico, and <br />Arizona).. <br /> <br />Finally, Reclamation will attempt to negotiate the final terms of an <br />agreement with the highest ranked proponents, This agreement may be a <br />grant, cooperative agreement, or formal contract depending upon the <br />circumstances and judgment of the contracting officer, Negotiations may be <br />terminated if the final terms are not acceptable to Reclamation, <br /> <br />Reclamation will conduct a limited test ofthe ranking portion of the process <br />and award fiscal year (FY) 1996 funds, Funding commitments under this <br />test will be limited to available FY 1996 funds, No commitments will be <br />made for out-year funding until the full RFP process is completed later in <br />1996, Small projects will be selected from alternatives ready to implement <br />and that can be completed within theFY 1996 timeframe, This test will be <br />used to refine ranking procedures included in the RFP, AB appropriate, <br />supplemental guidance for implementing the program will be included in <br />future RFP's or in the progress reports to Congress required by P,L, 93-320, <br /> <br />vi <br />
The URL can be used to link to this page
Your browser does not support the video tag.