Laserfiche WebLink
<br />Developing Salinity Control Targets <br /> <br />As seen by the results of the analysis, annual expenditures for the entire <br />salinity Ilontrol program (including the Reclamation, USDA, and <br />BLM prbgrams) must be consistently maintained at $22,5 million per year <br />N between! 1996 and 2000 to prevent salinity increases and ensure <br />c:J1 maintenance of the numeric criteria established within the Water Quality <br />o Standards for the Colorado River Basin. <br />1\,) <br /> <br />23 <br /> <br />i <br /> <br />-c'-' ~" <br /> <br />-'I <br /> <br />~ ,<-'j~~ ~ ~" <br /> <br />~A <br />