Laserfiche WebLink
<br />Implementation Plan <br /> <br />This does not include costs paid by non-Federal entities or other Federal <br />programs cost sharing in the improvements for their own purposes. <br /> <br />N <br />w.:.. <br />CD <br />N <br /> <br />Step 2 <br /> <br />Adding the Annual Costs to the Annualized Costs: This includes all <br />costs 'charged to the program on an annual basis. These may include <br />the cQst of annual technical assistance, monitoring, education, wildlife <br />replacement operation and maintenance (O&M), facility O&M, or <br />paynumts for privatized salinity control. O&M costs should not <br />inclu4,e costs paid by non-Federal entities or other Federal programs <br />cost sharing in the operation for their own purposes, <br /> <br />Step $ <br /> <br />Dividing the Total Annual and Annualized Costs by the Average Tons <br />Removed Per Year: The salt load reduction is expressed as an annual <br />valueito match the annualized costs. The result is dollars per <br />year/t;ons per year or dollars per ton, The salt load reduction is not <br />the ~ghest possible reduction expected but is an average annual <br />value! If fluctuations or potential shortfalls occur, these should be <br />considered in the risk portion of the ranking process, <br /> <br />The opjective of the program is to maintain the Colorado River Basin <br />water: quality standards, To be effective at meeting this goal, salinity <br />contrql projects must be located above all three of the gauging stations <br />used to monitor compliance with the standards, The most upstream <br />gauge is located just below Hoover Dam on the Nevada/Arizona border, <br /> <br />Cost In4.exing.-If the planned costs for proposed projects are not in <br />current dollar values, they will need to be indexed to one consistent level <br />(usually January 1 of the preceding year), <br /> <br />Minor :Qeplacement Costs.-Replacement costs are those expenditures <br />needed fOr hardware replacement that occur during the nonnallife of a <br />project, For example, sprinkler heads need to be replaced regularly to <br />maintain: a center pivot's efficiency, In general, Reclamation does not wish <br />to co~t to pay for these types of items because of the long-tenn <br />uncertaiIi).tie;;; involved with appropriating funds. This type of item should <br />be repladed at the owner's expense (considered cost sharing), In non- <br />federallyifinanced projects, all of the project costs should be included in the <br />fees paidibythe Government, including all operating, maintenance, and <br />replacem,ent costs, <br /> <br />Major I&placement Costs,-This is the replacement cost of the entire <br />facility, For example, a canal lining may last 50 years before it needs to be <br /> <br />13 <br /> <br />1 <br /> <br />~ " <br /> <br />:'.'_h <br /> <br /> <br />'} <br /> <br />",;~ <br />;2;,;,;;"",,~, ._ <br />