My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09081
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09081
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:06 PM
Creation date
10/12/2006 3:27:03 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
11/19/1981
Title
Narrows Dam Unit of the Pick-Sloan Missouri Basin Program
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> ..... 'n <br />, . . <br /> <br />The Burlington Canal is perennially deficient in water <br />supply because of the vast area of1arable land which it <br />aoes and can supply. The Narrows is eighty miles downstream <br />and consequently gravitationally u~able to meet any Burlington <br />needs. The cost of irrigation wat,r has been such a small <br />part of the total cost of creating'a viable agricultural <br />economy in Northeastern Colorado that the construction of <br />long pipelines and the continuing expense of pumping has <br />precluded any pumping to supply fa~ms except from wells <br />located on the land to be irrigated. . .- <br /> <br />The irrigation ditches betwee\l the Burlington and the <br />Kersey Gauging Station have all been historically fairly <br />well supplied and since Denver has'been importing water <br />from the Colorado River for its needs, the return flows <br />from these importations, together with reservoir releases <br />by Denver in times of natural watet shortage have so greatly <br />improved the water supply in this stretch of the Platte <br />that any need for water is largely: localized. The Town <br />of Platteville lies in about the center of this segment <br />of the River. From Plat teville down, the River is also _ _ , . <br />augmented by return flows from Colorado River importations <br />by the Colorado Big Thompson Project constructed by the <br />United States Department of Interior. These importations <br />tend to strongly stabilize the South Platte River below <br />Platteville because there is sufficient storage in both <br />the Denver system and in the CBT Project to afford supple- <br />mental water when it is needed most, in years of short <br />supply in the Platte River Basin. <br /> <br />The calculations of water need which might be met by <br />the Narrows Reservoir commenced before importation of water <br />from the Colorado River had begun to make an appreciable <br />impact. These new imported water~upplies, with Denver <br />constantly increasing its importat~ons, make the early <br />Narrows evaluations of water supplr and need obsolete. <br /> <br />It is thirty-five miles downs~ream from Kersey to <br />Narrows so that the cost of getting water back upstream <br />by long distance pumping and pipelines makes Narrows in- <br />effective to help this reach of the River. A positive <br />example of the adVerse economics of pumping upstream is <br />the operation of the Weldon Valley: Ditch which supplies <br />a part of the 19,000 acres of landiwhich would be inundated <br />and removed from agricuitural prodpction if the Narrows <br />were built. The cost for .this ditj::h is $25,000 per year <br />for delivering 30,000 acre feet of: water to the farmers' <br />land, less than a dollar an acre foot. This has been a <br />stable cost for many years, hardly influenced by inflation, <br />because gravity carries the water from the River to the <br /> <br />-4- <br />
The URL can be used to link to this page
Your browser does not support the video tag.