My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09080
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09080
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:05 PM
Creation date
10/12/2006 3:27:02 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.150
Description
Grand Valley Unit - Colorado River Basin Salinity Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
7/1/1982
Title
Monitoring and Evaluation Plan -- Colorado River Basin Salinity Control Program for Grand Valley Unit and Uinta Basin Unit, Utah -- PART I
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />r- <br />-~ <br />.n <br />...... <br /> <br />c:' <br /> <br />Levell. Every fifth year five operators will be selected and infor~ation <br /> <br />gathered on their operation. On the tenth year, follow-up will be gathered on <br /> <br />two operators who have com pIe ted LTA' s or irrigation improvements. <br /> <br />Level 2. <br /> <br />Every third year ten operators will be selected and information <br /> <br />gathered on their operation. Beginning with the sixth year of the study, <br /> <br />follow-up data will be gathered on three operators who have completed LTA I S or <br /> <br />irrigation improvements. <br /> <br />Level 3. <br /> <br />The first year operators that have improlTements or LTA's completed, <br /> <br />operators that have signed agreements with no work started, and operators that <br /> <br />will probably never sign LTA' s should be interviewed. Eaeh year interviews <br /> <br />should be gathered from operators by type of operation and type of irrigation <br /> <br />system. Annually fifteen operators will be selected and information gathered <br /> <br />from them. Beginning with the fifth year of the study, follow-up interviews <br /> <br />should be made with five previously interviewed operators that have completed <br /> <br />their LTA's or irrigation improvement. <br /> <br />Develop Onfarm Crop Budgets <br /> <br />A computer will be used to develop crop budgets to study c:hanges in quantity of <br /> <br />production, production cost and labor cost. <br /> <br />Develop Basin Impacts <br /> <br />Levell. This is a minimum effort determination. A model wIll be run every <br /> <br />five years. Cost is $30,000. Basic information gathered from onfarm case <br /> <br />history studies will be aggregated basin wide to identify total effects. The <br /> <br />change in activity in commodities of the basin will be used to determine the <br /> <br />44 <br />
The URL can be used to link to this page
Your browser does not support the video tag.