My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09078
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09078
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:04 PM
Creation date
10/12/2006 3:27:01 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.400
Description
Colorado River-Colorado River Basin Briefing Documents/History/Correspondence
Basin
Colorado Mainstem
Water Division
5
Date
5/1/1970
Title
Potential and Existing Reclamation Projects in the Grand Junction Projects Office Area
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />{:J017G5 <br /> <br />Hay 1970 <br /> <br />P:lOJZU: <br /> <br />Grand Valley <br /> <br />STAJ.'US: <br /> <br />O~er~tinz project. <br />in 1919 except the <br /> <br />Construction began in 1912 and was co~pleted <br />pcwerplant which Was constructed in 1932-33 <br /> <br />LOCATION: Hesa County in the vicinicy of Grand Junction, Colorado <br /> <br />SPONSORD!G AGEI\CY: Grand Valley !.late. Users Association <br />Orchard ~~sa Irrigacion Discrict <br /> <br />DESCR.IPTION: <br /> <br />llater frD~ the Colorado River is diverted into the Cover=.ent Hichline <br />Canal by the Grand Valley Diversion D3~about 23 miles northeast of <br />Grand Junction. About 4.6 miles below the diversion dam, part of the <br />~ater is siphoned under the Colorado River to the Orchard Mesa Power <br />Canal for conveyance to the pO\'lerplanc and then pumped to the Orchard <br />Xes" Canal for delivery to project lanes. The reQaining water in the <br />Goverrunent Highline Canal continues westward 'to serve lands in the <br />Grand Valley between Palisade and nearby state line. <br /> <br />PROJECT PURPOSES: <br /> <br />Irrigation - Supplemental service land <br />Full service land <br />Tot!,l <br /> <br />7,730 "cres <br />34,686 acres <br />42,416 acres <br /> <br />PROJECT FEATURES: <br /> <br />Po,:.]erplant <br />Grand Valley <br /> <br />Capacity <br />(k1 1m'2. tes) <br />3,000 <br /> <br />Diversion D2m <br />Grand Valley <br /> <br />(cfs) <br />75,000 <br /> <br />Can., 1 <br />G~verpJment Highline, <br />Orchard Mesa Power <br />Orchard Mesa 1\0. 1 <br />Orchard Mesa No. 2 <br /> <br />Length <br />(miles) <br />,55.0 <br />3.5 <br />15.5 <br />16.1 <br /> <br />Capacity <br />(ds) <br />1,675 <br />800 <br />85 <br />65 <br /> <br />: <br /> <br />I <br />I <br />I <br /> <br />22 <br />
The URL can be used to link to this page
Your browser does not support the video tag.