<br />t)7r '" <br />;;.. vb <br /> <br />Plan of Development <br /> <br />Three dikes would be required across low areas to maintain a <br />minimum crest elevation of 4453, the dam crest elevation, around the <br />reservoir. The dikes were designed with a crest elevation of 4453, <br />a crest width of 30 feet, an upstream slope of 2 to 1 protected by <br />a 24-inch layer of rock riprap on six inches of gravel bedding, and <br />a downstream slope of 2 to 1. 'L'he Riverside Dike would be a 6,100- <br />foot extension of the left abutment of Narrows Dam constructed <br />generally in conjunction with the south bank of the existing Riverside <br />Canal. Relocated State Eighway 144 would be on its crest. The 475- <br />foot-long Saddle Dike would be located about one-half mile south of <br />the right abutment of Narrows Dam on its projected axis. The Layton <br />Dike would begin about one mile south of the right abutment of Narrows <br />Dam near the southeast edge of the existing Bijou Reservoir No.2. It <br />would extend 6,160 feet around the south edge of that reservoir and <br />would be north of the existing Layton Lateral. <br /> <br />Electrical power for operating the facilities at the damsite <br />could be supplied by either the Morgan County Rural Electric Association <br />or the Public Service Company of Colorado since both organizations <br />have transmission lines in the vicinity. No arrangement has been made <br />for service with either, but the plan assumes that such an arrangement <br />will be (Dnsummated at an appropriate time. The plan does provide for <br />approximately three-fourths of a mile of 13.8 kv. line to be con- <br />structed from the point of delivery to the outlet works and to per- <br />manent operating facilities. <br /> <br />Relocations in the reservoir area would involve the main Chicago- <br />Denver line of the Union Pacific Railroad, State Eighway 144, a <br />county road, power and telephone lines, oil and gas pipelines, and a <br />30-grave cemetery. <br /> <br />Subject to negotiations with the railroad company, it is planned <br />to construct 32.22 miles of new line around the north side of the <br />reservoir to replace 30.34 miles of existing railroad along the north <br />bank of the river. For estimating the relocation cost, current <br />standards of construction as furnished by the Railroad Company were <br />used. Credit for betterments over equivalent replacement will be <br />obtained during negotiation. Salvage value of the old line also should <br />reduce the total cost of the relocation. <br /> <br />The cost estimate for relocation of State Eighway No. 144 reflects <br />some improvement of the road to bring it to current standards. The <br />additional cost over that for equivalent replacement would be $139,000. <br />Morgan County is reconstructing the county road to be relocated and <br />the cost of relocation is based on the county standards. <br /> <br />20 <br />