My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09050
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09050
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:52 PM
Creation date
10/12/2006 3:25:29 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.106
Description
Animas-La Plata
State
CO
Basin
San Juan/Dolores
Water Division
7
Date
5/10/2002
Author
USDOI-BOR
Title
Wetland / Riparian Mitigation and Monitoring Plan in the La Plata River Corridor - Final Draft
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />5.4 Operations and Maintenance Costs <br /> <br />Operation and maintenance costs of the mitigation for wetland and wildlife are estimated <br />according to the following table, (Table 7). <br /> <br />Table 7. ALP Wetland/Riparian Habitat and Wildlife Mitigation Operation and <br />Maintenance Cost Estimates <br /> <br />OPERATION AND MAINTENANCE ITEM <br /> <br />~EST. COST** <br /> <br />1. Maintain control of noxious weeds. $20,000 <br />2. Maintain upland habitat type ratios. $6,000 <br />3. Maintain and operate water resource infrastructure. $4,000 <br />4. Monitoring . . $4,000 <br />5. Reporting $1,000 <br />6. Infrastructure (roads, fence and signs) maintenance. $10,000 <br />7. OverheadlPersonnel cost estimate. $90,000 <br />Operation and Maintenance TOTAL per year. $135,000 <br /> <br />**Note that these cost estimates are broken out per year and all are not likely to occur in every <br />single year. <br /> <br />-48- <br />
The URL can be used to link to this page
Your browser does not support the video tag.