Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PRE L I M I N A R Y FIN DIN G S <br />Uinta Basin Unit <br />Phase II <br /> <br />R E P 0 R T <br /> <br />RECOMMENDATIONS <br /> <br />We recommend the termination of the planning investigations for <br />phase II of this unit. This recommendation is based on the lack of <br />cost-effective increments that can be presented as a single project. <br />However, as a result of phase II investigations, we recommend that the <br />lining of about 3.2 miles of My ton Townsite Canal and investigation of <br />winter water removal be considered as part of phase I preconstruction <br />activities. The estimated cost of lining is $2,043,300. Costs for <br />winter water removal have not been determined but are not considered <br />to be significant. <br /> <br />.... ,'" t. r.... ,', <br />! ' , Ii.' ,< 'I <br />\'.... .....i_... <br />