Laserfiche WebLink
<br />I <br />I <br />, Table <br />1 <br />I 2 <br />3 <br />4 <br />I SA <br />SB <br />I SC <br />6 <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'I <br />I <br /> <br />~~!~-0 ~ <br />t..) ~, ;) ~.; J J <br /> <br />TABLES <br /> <br />Reservoir Data <br />1990 Monthly Summary of Blue River Operations <br />1990 Actual Project Operations <br />Flood Damage Prevented in 1990 <br />1991 Project Operating Plan Under Most Probable Water Supply <br />Cond it ion <br />1991 Project Operating Plan Under Reasonable Minimum Water <br />Supply Condition <br />1991 Project Operating Plan Under Reasonable Maximum Water <br />Supply Condition <br />Annual Operating Plan Studies of Green Mountain Reservoir <br />For Water Year 1991 <br /> <br />i <br />