My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09026
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09026
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:44 PM
Creation date
10/12/2006 3:24:49 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.130.J
Description
West Divide Project
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1986
Author
Hydro-Triad Ltd.
Title
Reformulation of the West Divide Project - October 1986
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />l'J <br />~ <br />en <br />(,\,/ <br /> <br />LIST OF TABLES <br /> <br />1-1 Summary of Planning Scenarios <br />1-2 Cost Summary Table <br />1-3 Summary of Optimum Project Configurations <br />I~4 Financial Analysis, Summary of Annual Costs <br /> <br />IV-l Unit Prices Used For Cost Estimating <br />IV-2 Summary of Storage Costs <br />IV-3 Summary of Reservoir Land Costs <br /> <br />/ <br /> <br />V-I Colorado River Basin-Water Supply Scenarios <br />V-2 Scenario I-Flow in the Colorado River Below Cameo <br />V-3 Scenario II-Flow in the Colorado River Below Cameo <br />V-4 Scenario III-Flow in the Colorado River Below Cameo <br />V-5 Summary of Cameo Calls, Scenarios I, II and II! <br />V-6 Project Area Model, Water Use Assumptions <br />V-7 Project Area Crop Consumptive Use <br />V-8 Operation Study Results-Scenario A <br />V-9 Operation Study Results-Scenario B <br />V-lO Summary of Operation Study Results, East Divide Creek Reservoir <br />V-II Summary of Operation Study Results, Upper Beaver Creek Reservoir <br />V-12 Summary of Operation Study Results, Lower Beaver Creek Reservoir <br />V-13 Summary of Operation Study Results, Owens Creek Reservoir - 500 <br />acre Irrigation Demand <br />V-14 Summary of Operation Study Results, Owens Creek Reservoir - 1000 <br />acre Irrigation Demand <br />V-15 Summary of Operation Study Results, Owens Creek Reservoir - 1500 <br />acre Irrigation Demand <br />V-16 Summary of Operation Study Results, Yank Creek Reservoir - 1500 <br />acre Irrigation Demand <br />V-17 Summary of Operation Study Results, Yank Creek Reservoir - 3000 <br />acre Irrigation Demand <br />V-18 Summary of Operation Study Results, Yank Creek Reservoir - 5000 <br />acre Irrigation Demand <br />V-19 Operation Study Result8-Scenario D <br /> <br />VI-l Cost Comparison Summary - Scenario A <br />VI -2 Cos t Compari8on Summary - S.cenario B <br />VI-3 Cost Comparison Summary - Scenario D <br /> <br />LOT-l <br />
The URL can be used to link to this page
Your browser does not support the video tag.