My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08965
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08965
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:25 PM
Creation date
10/12/2006 3:23:07 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8210.470
Description
Pacific Southwest Interagency Committee
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
2/27/1960
Author
Various
Title
Quarterly Reports - Arizona-California-Colorado-Corps of Engineers-HEW-USCG-DOI-Utah-US Weather Bureau-Nevada-Et Al - 1959-1962
Water Supply Pro - Doc Type
Report/Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
204
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />(. " ~ (, <br /> <br />. <br /> <br />. <br /> <br />092JS'7. <br /> <br />~ <br /> <br />" <br />i <br /> <br />215 State Services <br />Denver 3, Colorado <br />March 4, 1960 <br /> <br />TOI Members, Pacific Southwest Inter-Agency Committee. <br /> <br />FROM: State of Colorado. <br /> <br />Buildinq <br /> <br />SUBJECT: Quarterly Report for 60-1 Meeting. <br /> <br />Field work was practically completed on a survey to <br />determine present uses of water in the San Juan River basin in <br />Colorado and to appraise the possibilities for future developments. <br />The Colorado Water Conservation Board authorized a similar survey <br />in the Gunnison River basin. ' <br /> <br />The Board also commenced studies of expanded irrigation <br />and power uses of Taylor Park Reservoir in the Gunnison basin which <br />may result from the construction of the authorized Curecanti unit <br />of the Colorado River Storage Project. <br /> <br />Studies are being made, by a State committee including <br />representatives of potential power users, to determine power re- <br />quirements of Colorado as related to the Colorado River Storage ! <br />Project and means of transmitting the project power to Colorado load ; <br />centers. Power and energy requirements have been estimated for each, <br />year to 1980. The committee will continue studies of transmission <br />requirements based on allocations and the power market area to be <br />designated by the Secretary of the Interior. <br /> <br />A reconnaissance survey of phreatophyte infestation in <br />Colorado has been completed. The survey was conducted on a drainage <br />basin basis by personnel of the Extension Service of Colorado State <br />University. The data obtained are being used in computations of <br />potential water salvage. <br /> <br />Funds have been recommended in the President's budget to <br />commence construction on the Curecanti unit and the Florida partici- <br />pating project of the Colorado River Storage Project, and to con- <br />tinue construction of the Collbran, Paonia and Smith Fork projects <br />in western Colorado. <br /> <br />r <br /> <br />RMG / lk <br /> <br />-1 ~ <br /> <br />. <br /> <br />Ji; ~",~',1 <br /> <br />j, <br />,< <br />.. <br />'''~,- <br />
The URL can be used to link to this page
Your browser does not support the video tag.