<br />I <br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />Ie <br />I <br />I <br />I <br />I <br />I <br />I <br />I. <br />I <br />I <br /> <br />5.1.6 Schedule of Work <br /> <br />The contractor will have 12 weeks to complete the work described as Phase 2 Scope of <br />Work No. 1. The starting date for the work will be the date the contractor signs the contract to <br />perform the work. <br /> <br />5.2 Phase 2 Scope of Work No.2 <br /> <br />A second Phase 2 scope of work has been prepared. Task descriptions for this second <br />scope of work are included on Table 2. This second scope contains additional tasks which are <br />related to Scope of Work NO.1. Scope of work NO.2 expands the layered-radial flow analyses <br />to five additional aquifer locations: the Dawson aquifer in the southern metro area; the Denver <br />aquifer in the northern metro area, the southern metro and south of the Palmer Divide; and the <br />Laramie-Fox Hills aquifer in the southern metro area. For wells at these five locations the <br />pumping groundwater level in the wells will be determined in response to projected long term <br />production rates. The economic analyses as described in 5.1.4 above will be performed on these <br />wells based on the wells' pumping water level and production rates. Phase 2 Scope of Work No. <br />2 tasks should be completed 15 weeks from the date of the signed contract. The estimated cost <br />for this work is $33,500. <br /> <br />17 <br /> <br />HRS WATER CONSULTANTS, INC <br />