My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08950
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08950
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:20 PM
Creation date
10/12/2006 3:22:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.131.A
Description
Yellow Jacket Project
State
CO
Basin
Yampa/White
Water Division
6
Date
5/2/1975
Title
CWCB Meeting May 2 1975: Current Status of Yellow Jacket Project
Water Supply Pro - Doc Type
Project Overview
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.r.: <br /><\" <br /> <br />00 <br />CD <br />,.::> <br />N <br /> <br />COLORADO WATER Cor~SERVATIOfJ BOARD MEETING <br />~lAY 2} 1975 <br /> <br />/' <br /> <br />CURRENT STATUS OF YELLOW JACKET PROJECT <br />1'kt l3url,1ot. III Rtf. La,.,,J1 ~ <br />~ C~MPLETED THE FIRST REGIONAL DIRECTOR'S REPORT ON <br />THE YELLOW JACKET PROJECT IN 1968. OBJECTIONS ON THE PLAN <br />PRESENTED IN THIS REPORT WERE RECEIVED BY FISH AND WILDLIFE <br />INTERESTS AND LOCAL INTERESTS, AFTER TWO YEARS OF FIELD <br />TRIPS AND COMPROMISES} A SECOND PROPOSED REGIONAL DIRECTOR'S <br />REPORT WAS COMPLETED AND DISTRIBUTED IN 1972 ALONG WITH A <br />DRAFT ENVIRONMENTAL STATEMENT, <br />THE PLAN IN THIS REPORT WAS AGAIN OBJECTED TO BY FISH <br />AND WILDLIFE INTERESTS. BETWEEN 1972 AND 1974 NO INVESTIGA- <br />TIONS WERE CONDUCTED BY THE BUREAU, <br />As A RESULT OF THE INCREASED INTEREST IN MINERAL AND <br />RELATED WATER RESOURCE DEVELOPMENTS IN THE WHITE RIVER BASIN} <br />FEASIBILITY STUDIES FOR THE YELLOW JACKET PROJECT WERE <br />RESUMED, NEW INVESTIGATIONS ARE CURRENTLY UNDERWAY UTILIZING <br />THE MULTIOBJECTIVE PLANNING PROCEDURES ADOPTED BY THE WATER <br />RESOURCES COUNCIL, WITH THIS PROCEDURE} ALTERNATIVES EMPHA- <br />SIZING ENVIRONMENTAL QUALITY AS WELL AS NATIONAL ECONOMIC <br />DEVELOPMENT WILL BE DEVELOPED, THIS PROCESS IS ESPECIALLY <br />RELEVANT TO THE YELLOW JACKET PROJECT AS BOTH OBJECTIVES ARE <br />OF MAJOR IMPORTANCE AND CONCERN IN THE WHITE RIVER BASIN, <br />
The URL can be used to link to this page
Your browser does not support the video tag.