My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08949
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:20 PM
Creation date
10/12/2006 3:22:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147.100
Description
Arkansas River-Arkansas River Basin Water Projects-Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
6/15/1950
Author
PolicyReviewCommitte
Title
The Policy and Review Committee First Phase Gunnison-Arkansas Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />shall be ~ubject to a beneficial use of such water as may be provided <br /> <br /> <br />in the payment contract or contracts. The rights to store water in <br /> <br /> <br />Aspen Rese~oir to the extent of 28,000 acre-feet shall be initiated, <br /> <br /> <br />acquired and held in the name of the United ~tates for the replacement <br /> <br /> <br />of water diverted to Eastern Colorado and for use in Vestern Colorado. <br /> <br /> <br />17. To assure project operation in coriformity with the operating <br /> <br /> <br />principles heretofore stated, to provide a means for the collection and <br /> <br /> <br />interchan~e of information, and to provide a method for the continued <br /> <br /> <br />study of project operations to the .end that, if the stated oferating <br /> <br /> <br />principles may be improved ufon, recommendations for changes may be made <br /> <br /> <br />to the contractin~ parties, a connission shall be created in an appropri- <br /> <br /> <br />ate manner to'be co;nposed of one representative of the Eastern Colorado <br /> <br /> <br />Conservancy District, one representative of the Colorado niver Water Con- <br /> <br /> <br />servation District, two representatives of the United ~tates, and one <br /> <br /> <br />representative of the ~tate of Colorado appointed by the Colorado Vater <br /> <br /> <br />Conservation Board aftar consultation ,nth the Colorado Game and Fish <br /> <br /> <br />Commission. The powers of such commission shall be limited to the <br /> <br /> <br />collection of data, the making of findings of fact, and the su~gestion <br /> <br /> <br />of changes in operating.principles. <br /> <br />III <br />NA~lli OF FROJ~CT <br />It is recommended that this project shall hereafter be referred <br />to as the Frying Pan-Arkansas Project. Approval of this provision by <br />Eastern Colorado representatives sh~ll not be implied as an abandonment <br />of their expressed intention to obtain approval of a project from the <br />Gunnison River nor shall approval of this provision by Western Colorado <br /> <br />OQ39 <br /> <br />-10- <br />
The URL can be used to link to this page
Your browser does not support the video tag.