My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08949
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:20 PM
Creation date
10/12/2006 3:22:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147.100
Description
Arkansas River-Arkansas River Basin Water Projects-Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
6/15/1950
Author
PolicyReviewCommitte
Title
The Policy and Review Committee First Phase Gunnison-Arkansas Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />In maintaining the above averages, at no time shall the flow be <br /> <br /> <br />reduced below 15 c.f.s. during the months of August to April, inclusive, <br /> <br /> <br />or below 60 c.f.s. during the months of May to July, inclusive, providing <br /> <br /> <br />the natural flow during said period is not less than these amounts. The <br /> <br /> <br />obligation to supply the minimum stream flow as set forth in the above <br /> <br /> <br />table on the Roaring Fork River to the extent of 3,000 acre feet annually <br /> <br /> <br />shall be a project obligation to be supplied from any waters diverted <br /> <br /> <br />from the south tributaries of Hunter Creek, Lime Creek, Last Chance Creek, <br /> <br /> <br />or any of them. <br /> <br /> <br />The Twin Lakes Reservoir and Canal Company shall not be required <br /> <br /> <br />to refrain from diverting water under its existing decrees from the <br /> <br /> <br />Roaring Fork River except to the extent that a like quantity of re- <br /> <br /> <br />placement water is furnished to said company without charge therefor <br /> <br /> <br />through and by means of project diversions. <br /> <br /> <br />If by reason of storage capacity reserved in the Aspen Reservoir <br /> <br /> <br />for replacement purposes as the term is used in paragraph 6 of these <br /> <br /> <br />Operating Principles, the Tvdn Lakes Reservoir and Canal Company derives <br /> <br /> <br />additional water or other benefits or advantages it ~rould not have <br /> <br /> <br />realized had this project not been constructed, then nothing herein <br /> <br /> <br />contained shall prevent the project from making appropriate charges for <br /> <br /> <br />such water or other benefits or advantages. <br /> <br /> <br />11. All lands acquired for project construction Rnd operation <br /> <br /> <br />and water surfaces of project reservoirs ~dll be open to the public for <br /> <br /> <br />recreational purposes, excepting those areas restricted by the operating <br /> <br /> <br />agency for reason of operation and safety. <br /> <br />-8- <br /> <br />061\1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.