My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08949
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08949
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:20 PM
Creation date
10/12/2006 3:22:45 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8147.100
Description
Arkansas River-Arkansas River Basin Water Projects-Gunnison-Arkansas Project
State
CO
Basin
Arkansas
Water Division
2
Date
6/15/1950
Author
PolicyReviewCommitte
Title
The Policy and Review Committee First Phase Gunnison-Arkansas Project
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.No charge shall ever be imposed for water released from, or made <br /> <br />available by reason of releases from, the replace'rrent capacity of the <br /> <br />Aspen Reservoir. <br /> <br />7. That portion of the total capacity of the Aspen Reservoir not" <br /> <br />needed as replacement capacity constitutes surplus capacity. Water stored <br /> <br />in such surplus capacity may be sold or leased by the United States to <br /> <br />water users in Western Colorado. Charges for the use of such water shall <br /> <br />be cOl'.1parable to charges for use of project water for similar purposes <br /> <br />in Eastern Colorado vdth appropriate adjustment for the repayment ability <br /> <br />of such water users. If it hereafter appears that the cost of procuring <br /> <br />water, frpm sources other than the surplus capacity of the Aspen Reser- <br /> <br />voir, for the same uses as those to which water from the surplus capacity <br /> <br />of the reservoir is to be made available shall have been increased by <br /> <br />reason of the construction and operation of the project, then the charges <br /> <br />for water released from the surplus capacity shall be diminished by the <br /> <br />amount of such incrllase in cost. <br /> <br />8, Project diversions from Lime Creek shall be made only in the <br /> <br />months Of May and June of each year. <br /> <br />9. To protect recreational values, including fishin~, no diversions <br /> <br /> <br />from Vf'ils.~ern Colorado ,lill be made ';,hich reduce the remaining aggregate <br /> <br />" <br /> <br />stream flowa to less than either of the following minimum standards: <br />(a) The Frying Pan collectiop system at the points <br /> <br />of diverBian collectively, e::clusive of Lime Creek, -- 15 <br /> <br />c.f.s., October 1 thrQugh J.larch )1; 30 c.f.s., April 1 through <br />September )0. <br /> <br />...6- <br /> <br />~~':> <br />\) <br />
The URL can be used to link to this page
Your browser does not support the video tag.