Laserfiche WebLink
<br /> <br />Grand Hesa Project <br />September 1973 <br /> <br />ESTIMATED COSTS <br /> <br />Construction costs (January 1972 prices) <br />Electric Mountain Dam and Reservoir. <br />Cactus Park Dam and Reservoir. . . <br />Grand Mesa Canal . . . . . . . . . <br />Cedaredge Canal and Lower Redlands Lateral <br />Electric Mountain Feeder Canal . . . . . . <br />Surface Creek Feeder Canal . . . . . . . . <br />Ward Creek and Fruitgrowers Feeder Canals. <br /> <br />. <br /> <br />$17,314,000 <br />20,381,000 <br />23,200,000 <br />5,323,000 <br />366,000 <br />3,067,000 <br />1,266,000 <br />792,000 <br />219,000 <br />2,352,000 <br />420,000 <br />325,000 <br />60,000 <br />-1,713,000 <br />76,798,000 <br />772,000 <br />77,570,000 <br /> <br />. <br /> <br />Drains . . . . . .. . . . . . .. <br /> <br />Permanent operating facilities <br />Grand Mesa recreation lakes. . <br />Waterfowl management area. . . <br />improvement of big game range. <br />Fencing for deer and elk . . <br />Recreational facilities. . . <br />Total construction cost <br />Cost of investigations. . . <br />Total project costs . . <br /> <br />. <br /> <br />Annual operation, maintenance, ~nd replace- <br />ment costs (1967-69 prices) . . . . . . . <br /> <br />. . .. . . . .. . <br /> <br />197,800 <br /> <br />BENEFIT-COST ANALYSIS (lOO-year period) <br /> <br />Average annual benefits <br />Irrigation . . . . . .. <br />Municipal and domestic water <br />Recreation . . . . <br />Fish and wildlife. <br />Area redevelopment <br />Subtotal. . . <br />Less benefits lost in reservoir basins <br />Total benefits. . . . . . . . . . . . <br />Amlual equivalent costs (5t percent interest) <br />Benefit-cost ratio. . . .. .. .. .. .. .. .. . .. .. .. <br /> <br />. <br /> <br />$4,502,000 <br />350,000 <br />916,000 <br />460,000 <br />487,000 <br />6,715,000 <br />15,000 <br />6,700,000 <br />4,901,000 <br />1.37:1 <br /> <br />. . <br /> <br />. . <br /> <br />3 <br />