Laserfiche WebLink
<br />Power Operations and Major <br />Maintenance Activities <br /> <br /> <br />Upper Basin.Colorado River <br />Storage Project <br />Westinghouse Electric Corporation <br />continued contract work to uprate the <br />generators at Glen Canyon Powerplant. <br />During 1985, work was completed on unit <br />3 and started on unit 8. Units 8 and 7 are <br />scheduled to have their uprates completed <br />in 1986, with work on unit 4 to start in <br />late 1986. Uprating of all the units is <br />scheduled for completion by April 1987. <br /> <br />The fOllowing table summarrzes CRSP <br />generation, purchases, disposition, and <br />revenues from power operations for fiscal <br />year 1985, and present projections for <br />fiscal year 1986. <br /> <br />The total revenue from power operations <br />in fiscal year 1985 was $137,190.303. For <br />fiscal year 1986, estimated revenues are <br />$91,000,000. <br /> <br />~.. ''''.f''',~.1J'";A~'''':>.;~~t~r' <br />~"'.... ...~~'t', ~,,' ., ~'"'!;"A,,'J~;t.<~ <br />fj.;~,,;,,'.;.~.-.it"i"$:."'r:,::;:. './ _ .... .:.4.{~ ,"'-1 <br />r..... ..' ".. // ". .."1 <br />j~, . :.:,' , ,'.. :.. >. <. . ~ "..// 1.:: '\ <br />. .. //. ~ , <br /> <br />f" ... ~../jjf~i~~':i#f~::"Y;ifYJ <br />,:X-~>'- /~]:~~1.}? : ":<:>'> . ; <br />\ _:;'~., ;/:~~,'\ ~_...:...~~.: ..._' . I <br />I . . ~~..~ - . c:;- '-'> <br /> <br />~.~ . jb</:. I,:~-"' <br />,':",... \" <br />rl. . ". . "", . <br /> <br /> <br />TransmiSSion Lines unaer ConSlrucllon <br /> <br />30 <br /> <br />Water Year 1985 Lower Basin - Water Year 1985 <br />Sources 01 Energy The total energy delivery to the Hoover <br />Kilowatt.hours allottees during the 1985 operating year <br />Net Generation (June 1, 1984 - May 31, '985) was <br />Blue Mesa 425,357,600 9,558,500,906 kilowatt.hours (kWh). Of <br />Crystal 238,134,000 thai amount, 5,640,220,906 kWh was <br />Flaming Gorge 717,133,000 secondary energy in excess of contract <br />Fontenelle 26,249,300 defined firm energy. <br />Glen Canyon 8,772,555,640 The remole controi operation of Davis <br />Morrow Poinl 558,622,000 <br />Subtotal - and Parker Powerplants, which first <br /> began during water year 1982, continued <br />Net Generation 10,738,051,540 without event. These generator units are <br />Purchases 696,156,000 computer operated from the Department <br /> of Energy's Phoenix Dispatch Office, <br />Miscellaneous Kilowatt.hours using hourly gate opening and megawatt <br />Interchange Receipts 1,029,000,000 schedules input and modified by Recla- <br />Energy Charges mation's Water Scheduling Branch in <br />to Transmission Boulder City, Nevada. <br />Service Customers 292,500,000 Scheduled maintenance at Hoover Dam <br />Subtotal - for water year 1985 included normal <br />Miscellaneous 1,321,500,000 replacements of stators, thrust bearings, <br />T olal Energy From water pipes, and transformers. Upraling <br />All Sources 12,755,707,540 of units N.7 and A5 was completed in <br /> May, 1985. <br />Disposition 01 Energy Kilowatt-hours The 5-year inspection and maintenance of <br />Firm Energy Sales 8,406,523,000 penstocks and main unit GA at Davis <br />Nonfirm Energy Sales Dam was scheduled beginning in Septem- <br />Emergency and ber 1985 through December 1985. <br />Fuel Replacement Outages and maintenance for Parker <br />(Oil Conservation) 3,027,864,000 <br />Interchange Deliveries 302,000,000 Dam during water year 1985 included the <br />System Losses 1,019,320,540 tollowing: Unit 2 underwent a 1-year <br />Total Energy Distributed 12,755,707,540 inspection and maintenance including 15 <br />kV cables replacement; Unit 4 had a <br />Revenue Dollars 2-year inspection and maintenance <br />Firm Power Sales $ 75,672,466 including 15 kV cables replacement; Unit <br />Non firm Power Sales 58,379,288 1 had its 1-year inspection and main- <br />Emergency Power tenance including 15 kV cables; and Unit <br />Fuel Replacement 3 underwent a 4.year inspection including <br />(Oil Conservation) Energy turbine runner repairs. In January 1985, a <br />Reserve Capacity -0- new 70-kW emergency generator was <br />Parker-Davis Project installed. In February 1985, gate stems <br />Firming -0- on penstocks 1, 2, 3, and 4 were <br />Transmission Service replaced, and in March 1985, thrust <br />Revenue 2,214,639 bearings on Unit 1 were replaced. <br />Miscellaneous Revenue 923,910 Water Year 1986 <br />Total Gross Revenue $137,190,303 In operation studies of Lake Mead and <br /> Lake Powell for the Hoover operating <br />Water Year 1986 year, which ends May 31, 1986, the <br />(Projected) Kllowatt,hours amounts released at Hoover Dam have <br />Estimated Energy Sales 6,120,000,000 been projected to satisfy both <br />Estimated Purchases 890,000,000 downstream water requirements, <br />Estimated Peaking including diversions by MWD, while also <br />Capacity Sales complying with the overall requirements <br />Winter 1985.86 48,000 to meet compact, t100d controi, and <br />Summer 1986 100,000 operating criteria release provisions. The <br />Estimated Revenue ($) 91,000,000 water scheduled to be released will <br /> generate 100 percent of contract defined <br />