<br />Engineering Table 15. - Generalized irrigation system criterLll) Floriia <br />project 11 <br /> <br />Cost estimates <br />on-farJll laterals . five cents per foot <br />Field ditches - ~ cents per foot except area 0 <br />Area D - one cent per foot <br />Farm dl tch structures approxiJllately $2$,,00 c. i ,p, <br /> <br />Far.aa di tch structures <br />Area A estimate 1 per 60 aCNS, cost .$0.45 per acre <br />B estimate 1 per 7 acreS approximately, cost $3.65 P@l' acre <br />C estimate 1 per 4 1/3 acres approxilllately. cost $5.75 per acre <br />D e~tfute 1 prer 9,,8 acres approximately, cost $2SS per acre <br />Raquireaent$ based on field si~e. grade of ditch. ~inent soils & $t.~cture ~sv <br /> <br />Farm s <br />Area <br />B <br />C <br />D <br /> <br />1 laterals new lands in block;\! onl <br />) eet per acre <br />5 1/4 feet per acre <br />$ feet per acre <br />None <br /> <br />Fal"lll p.eely~lateral structures <br />Area $468.00 per average 3-farm Fs.., approximately $1.00 per &C%'!l <br />B 800.00 per average 3-faIlll Fs.., approximately 1.60 per ClcN <br />C 1,080.00 per average 3-fli.l"lll Fs.., approximately 2.00 per acr:l <br />D None <br /> <br />Fll1'IIl ditch requirelllents <br /> <br />Evaluation <br />area <br /> <br />(new & replacement) <br />Average <br />irrigation runs <br />Feet <br />- <br />660 <br />660 <br />660 <br /> <br />Field dl tch on-farm lat'lral <br />requirement requiremeJ~ <br />Feet per a~ <br />100 20 <br />100 )0 <br />100 60 <br /> <br />A Presently Irrigated <br />New land, intermingled <br />Separate blocks <br /> <br />B Presently irrigated 250 <br /> Nev land, intermingled 250 <br /> Separate blocks 250 <br />C Presently Irrigated 2h5 <br /> Nev land. intermingled 275 <br /> Separate blocks 27S <br />D Presently irrigated 460 <br /> <br />100 <br />170 <br />170 <br />180 <br />166 <br />168 <br />95 <br /> <br />30 <br />33 <br />66 <br />40 <br />50 <br />66 <br />25 <br /> <br />Clearing (rangelands on1y~ <br />Area Intermingled lands <br />A $32.00jac. <br />B 15.00 <br />C 15.00 <br />D None <br /> <br />New la."ld blocl':s <br />$26,00/ac. <br />8.00 <br />12,00 <br />None <br /> <br />..... <br />, T <br />Y Developaent estimated vi th change frOlll proJeeted vi thout to vi th-,:roject. <br />condl tions. Represents approximately 50% of total wi thoopro.lect develonment.- <br />