<br /> 4""
<br /> ~able 37.--Summary of cost allocations, Senate Resolution 148 c.
<br /> C",
<br /> ($1,000) ("~f
<br /> Flood Road Fish & wildlife enhancement
<br /> Item Total Irrigation control relocation Recreation Local National Total
<br />100-year period of analysis
<br /> Separable costs-remaining
<br /> benefi ts method
<br /> Project costs 01,820,0 26,199.4 19,016.1 139.0 :11,845.5 3,738.0 882.0 4,620.0
<br /> Interest during construction 4,918.6 2,167.9 1,580.0 11.6 824.5 279.9 54.7 334,6
<br /> Annual OM&R 168.2 22.4 9.1 105.4 23.0 8.3 31.3
<br /> Priority of use method
<br /> Project costs 61,820.0 7,980.4 26,611.4 139.0 19,752.7 6,125.1 1,211.4 7,336.5
<br />I-' Interest during construction 4,918.6 663.1 2,207.3 11.6 1,477.6 477.0 82.0 559.0
<br />I-' Annual OM&R 168.2 3.8 16.9 113.5 25.4 8.6 34.0
<br />+-
<br /> Incremental cost method
<br /> Project costs 61,820.0 46,608.0 1l,088.0 139.0 2,555.5 932.8 496.7 1,429.5
<br /> Interest during construction 4,918.6 3,935.6 81.3.1 ll.6 57.2 48.2 22.9 71.1
<br /> Annual OM&R 168.2 44.3 95.9 20.1 7.9 28.0
<br />50-year period of analysis
<br /> Separable costs-remaining
<br /> benefits method
<br /> Project costs 61,820.0 27,467.8 18,518.2 139.0 10,979.8 3,859.2 856.0 4,715.2
<br /> Interest during construction 4,918.6 2,272.6 1,538.9 ll.6 753.0 289.9 52.6 342.5
<br /> Annual OM&R 157.6 23.7 8.6 93.9 23.1 8.3 31.4
<br /> Priority of use method 14,477.9 6,077 .5
<br /> Project costs 61,820.0 19,1l0.0 22,015.6 139.0 5,072.3 1,005.2
<br /> Interest dur~ng construction 4,918.6 1,582.3 1,827.8 H.6 1,041.9 390.1 64.9 455.0
<br /> Annual OM&R 157.6 15.2 12.2 97 .5 24.3 8.4 32.7
<br /> Incremental cost method.
<br /> Project costs 61,820.0 46,608.0 11,088.0 139.0 2,555.5 932.8 496.7 1,429.5
<br /> Interest during construction 4,918.6 3,935.6 843.1 H.6 57.2 48.2 22.9 71.1
<br /> Annual OM&R 157.6 44.3 85.3 20.1 7.9 28.0