My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08920
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08920
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:11 PM
Creation date
10/12/2006 3:21:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.900
Description
Bear Creek
State
CO
Basin
South Platte
Date
4/26/1990
Author
CWCB
Title
Bear Creek Operations Study - Scope of Study
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />* <br /> <br />as modified <br /> <br />** <br /> <br />Evergreen may wish to claim up to 750 a.f. and would be <br />responsible for any additional study costs associated <br />therewith. <br /> <br />2. Storage Account Evaporative Loss Replacement: <br /> <br />In addition to replacing evaporative losses from the <br />permanent pool. each entity will be assessed evaporative <br />losses on water actually stored in its reservoir storage <br />account. Replacement of evaporative losses from an <br />entities storage account will be the sole and direct <br />responsibility of that entity.. <br /> <br />Study Data to be Provided <br /> <br />The following basic data will be provided to the consultant <br />for the operations study. <br /> <br />Area-Capacity Tahles. The Corps of Engineers has provided <br />the most recent area-capacity tnbles, dated June, 1986. The <br />appropriate tables for the study are attached. <br /> <br />Storable Inflow and Releases. Each entity shall provide <br />the consultant the following information for the hydrologic <br />sequence to be evaluated: <br /> <br />a) A list of all water rights that will be used for <br />storage, augmentation and evaporation makeup. <br /> <br />b) The amount of water. on a monthly basis, that the above <br />water rights will yield for storage in Bear Creek <br />Reservoir. [A monthly time step will be used unless <br />the consultant recommends another time increment to the <br />Study Committee] <br /> <br />c) The amount of water that will need to be released from <br />each entity's storage account to the river on a monthly <br />basis to augment out-of-priority depletions at full <br />buildout. <br /> <br />[Some or all of this data may have been developed already. <br />either as part of an operating plan or as part of a court <br />.decreed plan of augmentation.] <br /> <br />AccountinG Procedure <br /> <br />An accounting procedure to simulate reservoir elevations. <br />stored inflows, evaporation losses, and storage releases to the <br />river shall be utilized as set forth herein to operate the <br />system. The tables described below and in Appendix A shall be <br />prepared to aid in data computation and in carrying out the <br />operations study. However, as noted in the section on "Study <br /> <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.