Laserfiche WebLink
<br />';PR IS':lU I""'" <br /> <br />"l"'\"'l:l...'1'l l,.\lH I ~r;: <br /> <br />I""'l,,,....' r<.....W~..... ,.;t"Yo,J- <br /> <br />":;"'~ <br />I,' <'.' <br />\:,: <br /> <br />'c,\ <br />,-? <br /> <br />, <br />, <br /> <br />7 <br />1 wildlife, air quality, and threatened and endangered <br />2 species; . <br />3 (3) identify mll.71SJogement policies s.nd opera.ting <br />4 criteria for the project iacilities tmd the respective costs <br />5 and benefits of these policies and criteria to water tmd <br />6 power users tmd to-recreational and envirownental <br />7 values; and <br />8 (4) identify long-term monitoring requirements <br />9 thB.t will ensure that Glen Oanyon Dam is operated in <br />10 & manner consistent with the requirements of section 2 <br />11 of this Act. <br />12 (b) Based on the fiDdingli, conclusions, and recommend&- , <br />13 tions of the studies and the statement prepared pursuant to <br />14 subsection (a.) of this section, the Secretary shall &dopt new <br />, <br /> <br />15 long-term operating criteria for Glen Canyon Dam. Such cri- <br />16 teria sh.all, at a rnilli11lUIn, e~ that Glen Otmyon Dam is <br />17 operated in 8. manner consistent with the requirements of sec- <br />18 tion 2 oftms Act. <br />19 (0) Upon completion of the requirements of subsection <br />20 (b) of this section, the Secretary, sha.ll submit to the Oon- <br />21 gress- <br />22 (1) the studies and the statement descn"bed in sub- <br />23 section (a) of this section; s.nd <br />24 (2) a report describing the new long-term operat;. <br />25 ing criteria for Glen Otmyon Dam and other measures <br /> <br />J <br /> <br />" <br /> <br />~: <br />.i <br />::; <br /> <br />. \ <br />:.1 <br />,"'. <br /> <br />I,: <br />, <br /> <br />'...1 <br /> <br />.)'1 <br /> <br />.., <br />~; <br /> <br />:;.:.1 <br />i'- <br />~~i <br />..~~ I <br />!<i,1 <br />. ~... I <br /> <br />n_m <br />