Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />ffl~TV MUTUAL <br />DESCRIPTION OF <br /> <br />IRRIGATION COMPANY <br /> <br />WORK AND COST ESTIMATE <br /> <br />COMANCHE CANALIContinued) <br /> <br />m. Drop I< <br /> <br />REMOVE CONCRETE <br />FOUNDATION PREPARATION <br />STRUCTURAL CONCRETE <br />NEW GATES AND HOISTS <br /> <br />1 EA @ $800 $ 800 <br />40 CY I~ $9.00 $ 360 <br />16 CY @ $325 $ 5200 <br />4 EA @ $8000 $ 32000 <br /> ------- <br /> Subtotal: $ 38360 <br /> <br />n. Drop L <br /> <br />EROSION PROTECTION <br /> <br />1 EA @ $6000 <br /> <br />$ 6000 <br /> <br />Subtotal: $ 6000 <br /> <br />Subtotal for Comanch~ Drop Structur~s: $ 171995 <br /> <br />2, Pip~ Drop Structur~(mil~ 16,0) <br /> <br />R~plac~ inl~t and outl~t; add erosion protection <br />at outl~t; Insp~ct barr~l, Requir~d r~pairs and <br />patching of barr~l to be determined during inspection. <br />V~ry rough estimate given h~re, <br /> <br />DE~JATER AND CLEAN 1 EA @ $5000 $ 5000 <br />INSPECTION 1 EA @ $1000 $ 1000 <br />REMOVE CONCRETE 2 EA @ $2500 $ 5000 <br />FOUNDATION PREPARATION 200 CY @ $9.00 $ 1800 <br />STRUCTURAL CONCRETE 160 CY @ $325 $ 52000 <br />REPAIR AND PATCH 25 CY @ $450 $ 11250 <br />EROSION PROTECTION 1 EA @ $2500 $ 2500 <br /> ------- <br /> Subtotal for Pipe Drop Str~lctur~: $ 78550 <br /> ------- <br /> TOTAL FOR COMANCHE CANAL: $ 250545 <br /> <br />A-10 <br />