My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08894
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:04 PM
Creation date
10/12/2006 3:20:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8135.100
Description
Ditch Companies - Amity Mutual Irrigation Company
State
CO
Basin
Arkansas
Water Division
2
Date
6/1/1983
Author
McCall-Ellingson Mor
Title
PL 84-984 Loan Application Report for the Amity Mutual Irrigation Company - Rehabilitation Plan-Amity System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />.. <br />I <br />I <br />I <br />. <br />. <br />. <br />I <br />I <br />I <br />I <br />I <br />. <br />. <br />. <br />I <br />I <br /> <br />111 <br /> <br />McCALL <br />ELLINGSON <br />MORRILL, INC <br /> <br />. Consulting Engineers . 1721 High Slreet . Denver. Coio'ado80218 <br /> <br />(3Q3) 321-2282 <br /> <br />June 21. 1983 <br /> <br />Mr, B. E, Martin <br />Regional Director <br />Lower Missouri Region <br />Building 20. <br />Denver Federal Center <br />Denver. Colorado 80225 <br /> <br />Dear Mr. Martin: <br /> <br />We are hereby transmitting a Loan Application Report for the proposed <br />Rehabilitation Plan for the Amity System under the Small Reclamation <br />Projects Act - P,L. 84-984. <br /> <br />This report is transmitted to you by McCall-Ellingson & Morrill. Inc., <br />on behalf of The Amity 11utual Irrigation Company, The firms of CH2:.! <br />Hill and L & HConsulting Engineers have both worked previously on <br />this project for Amity; CH211 Hil I completing the Reconnaissance Report <br />and l & H Consulting Engineers doing much of the background work for <br />this application report. <br /> <br />In November 1979, McCall-Ellingson & Morrill, Inc., was retained by <br />the Amity to complete this application report. A perceived disconti- <br />nuance of funding for PL 984 projects significantly delayed the final <br />submittal of this report. <br /> <br />An important feature of the Amity's future pla~ning is the construction <br />of a water storage dam on Wild Horse Creek. At one time. the construc- <br />tion of the dam was included in this loan application report, It is <br />not included nOW because the requirement of a high or even moderate <br />hazzard spillway make the cost of a conventional embankment with a <br />separate spillway prohibitive. Dam safety criteria developed bY.the <br />State of Colorado based on incremental da~age analysis is expected to <br />reduce the spilhlay requirement. Also. the development roller cor.~acted <br />concrete may make the construction of a concrete dam with an integral <br />spillway a more economical alternative than a conventional emba~kment <br />with a separate spillway. <br /> <br />The engineering studies necessary to better define the dam's construc- <br />tion requirements have not been performed in order to expedite the <br />completion of the loan application report for much needed rehc~ilitation <br />of the existing system. It is anticipated that in the future a PL 84- <br />984 application will be submitted for a supplem9r.tal or acditicnal loan <br />to finance the construction of the Wild Horse Creek Dam. <br />
The URL can be used to link to this page
Your browser does not support the video tag.