Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />l1B1 <br /> <br />AMITY MUTUAL IRRIGATION COMPANY <br />TABLE 12 <br />SUMMARY OF ESTIMATED PROJECT COSTS <br /> <br />(Thousands of Dollars) <br /> <br />TOTAL PROPOSED CONSTRUCTION <br />CClnt i nCJency <br /> <br />Subtotal <br /> <br />$ 2581 <br />,. 516 <br />------- <br />$ 3097 <br />$ 619 <br />------- <br />$ 3716 <br />$ 557 <br />------- <br />$ 4273 <br />$ 20 <br />$ 30 <br />$ 972 <br />$ -1 <br />------- <br /> <br />Pr"i.ce Escalation <br /> <br />Subtotal <br /> <br />. <br />Engineering and Administration <br /> <br />Subtotal <br /> <br />Bureau Par-ticipation: <br />Processing Application <br />Loan Adiministration <br />Amity contribution <br />(not included above) <br />Less filing fee <br /> <br />TOTAL PROJECT COST $ 5294 <br /> <br />LESS: <br />Total Amity Contribution <br />(Includes contingency. price <br />escalation, engineering and <br />administration on future <br />construction. ) <br /> <br />$ -1071 <br /> <br />LOAN OBLIGATION $ 4223 <br /> <br />LESS: <br />Bureau Expenditures Prior to Loan <br /> <br />$ <br /> <br />-20 <br /> <br />TOTAL APPROPRIATION REQUIREMENT $ 4203 <br /> <br />LESS: <br />Bureau Administration of Loan <br /> <br />,. <br /> <br />-30 <br /> <br />FUNDS TO BE ADVANCED BY THE UNITED STATES $ 4173 <br /> <br />5-3 <br />