Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1168 <br /> <br />TABLE 1 <br />PROJECT COST ESTIr1ATE SW1MARY <br /> <br />Construction Costs <br /> <br />Ami ty Cana 1 <br />Commanche Canal <br />Pawnee Canal <br />Kicking Bird Canal <br />Great Plains Reservoirs <br />Genera 1 Items <br />Applicant Contribution (Construction) <br /> <br />Total Direct Cost <br /> <br />Contingencies <br />Projected Price Escalation <br />Engineering and Administration <br />Right-of-Way <br />Water Rights <br />Water and Power Participation <br />District Administration (Contribution) <br /> <br />Total Construction Cost <br /> <br />Application Report <br />TOTAL PROJECT COST <br /> <br />S-5 <br /> <br />Amount <br />(OOOs) <br /> <br />$1,325 <br />251 <br />28 <br />102 <br />103 <br />712 <br />931 <br /> <br />$3.452 <br /> <br />$ 516 <br />619 <br />557 <br />o <br />o <br />50 <br />20 <br /> <br />1,762 <br />$5.214 <br />80 <br />$5.294 <br /> <br />, <br />