Laserfiche WebLink
<br />, <br /> <br /> Table 3 680e <br /> Bureau of Reclamation Salinity Control Unit Summary <br /> Salt potential Cost Total Annual Cost <br /> removed Salt thru capital O&M Effec~ive <br /> thru FY96 removal FY96 Cost Costs ness <br />llnit/Study Implementation (tons/yr) (tons/yr) ($100G's) ($1000's) ($1000's) ($/ton) <br />Meeker Dome 1980~1983 48,000 48,000 3,100 3,100 0 5 <br />Las Vegas Wash 1978-1985 3,800 ..3,800 1,757 1,757 50 51 <br />Grand Valley 1980-1998 120,000 127;500 .151,500 160,000 432 106 <br />Paradox Valley 1988-1996 . 128,000 128,000 67,400 67,400 2,800 71 <br />Dolores 'Project 1990-1996 23,000 23,000 44,700 44,700 33 160 <br />Lower Gunnison 1991-1995 41,380 .41,380 24,000 24,000 416 56 <br />Winter Water <br />Subtotal 364,180 371,680 292,457 300,957 3,731 76 <br /> Basinwide Salinity Program (PL 104-20) <br />San Juan-Hammond 1996- 0 48,130 0 13,486 0 23 <br />Price-San Rafael 1997- 0 57,580 0 16,851 0 24 <br />Navajo Well Plugs .1997- 0 500 0 71 0 12 <br />Subtotal 0 106,210 0 30,408 0 23 <br /> <br />PROGlU\M TO'l'ALS <br />Total 364,180 477,890 292,457 <br />Note: PSR costs include $4m for USDA onfann activities in FerrGn. <br /> <br />331,365 <br /> <br />3,731 <br /> <br />64 <br /> <br />26 <br />