<br />'l\:)
<br />1-.)
<br />to
<br />~
<br />
<br />YEAR
<br />1985
<br />1986
<br />1987
<br />1988
<br />1989
<br />1990
<br />1991
<br />1992
<br />1993
<br />1994
<br />1995
<br />
<br />CHART' 3
<br />
<br />ANN D,P, BASELINE
<br />11 23,9
<br />11 23,9
<br />31,1 23,9
<br />24.1 23,9
<br />23.5 23,9
<br />21,9 23,9
<br />15,5 23,9
<br />8,6 23,9
<br />4,3 23,9
<br />9.5 23,9
<br />11,5 23,9
<br />
<br />GOAL CDS AVER PGP AVER PGS AVER SITE AVER CROP
<br />19,9 21,9 16.7 CORN
<br />19,9 21,9 16,7 SM, GRAIN
<br />19,9 21,9 16,7 SM, GRAIN
<br />19,9 21.3 16,7 SM, GRAIN
<br />19,9 21.3 18.7 ALFALFA
<br />19,9 21,3 16,7 AlFALFA
<br />19,9 21.3 16,7 ALFAlFA
<br />19,9 8,5 16.7 ALFALFA
<br />19,9 8,5 16,7 ALFALFA
<br />19,9 8,5 16.7 ALFALFA
<br />19,9 8,5 16,7 ALFALFA
<br />
<br />SYSTEM
<br />CDS
<br />CDS
<br />CDS
<br />PGP
<br />PGP
<br />PGP
<br />PGP
<br />PGS
<br />PGS
<br />PGS
<br />PGS
<br />
<br />ANN D,P,. ANNUAL DEEP PERCOLATION FOR THE SITE
<br />BASELINE. AVERAGE DEEP PERCOLATION FOR ALL SITES MONITORED 5 YEARS OR MORE 1985 THROUGH 1989,
<br />GOAL' PROJECT GOAL OF A 4 INCH REDUCTION IN DEEP PERCOLATION, (AN ADDITIONAL 2 INCH RED FOR SURGE,)
<br />CDS. CONCRETE DITCH TO SIPHON TUBES
<br />PGP. UNDERGROUND PIPE TP GATED PIPE
<br />PGS. UNDERGROUND PIPE TO GATED PIPE WITH SURGE VALVES
<br />SITE AVER. AVERAGE DEEP PERCOLATION FOR THE SITE OVER THE ELEVEN YEAR PERIOD
<br />
<br />NOTE: THIS IS THE ONLY SITE THAT HAS BEEN MONITORED EVERY YEAR
<br />THIS SITE HAS HAD THREE (3) DIFFERENT OPERATORS,
<br />
<br /> 30
<br />~
<br />'"
<br />2
<br />~
<br />5
<br />3 20
<br />8
<br />"
<br />~
<br />Ib
<br />1j
<br /> I.
<br />
<br />SITE '21: MONITORED CROP ROTATION WITH SYSTEM CHANGES
<br />Site manttor.a fur 11 yewt. with t-N\) l1M\M changes and'lhrae dift'eorent OPlr1ltDl'$,
<br />
<br />..
<br />
<br />~ ~ ~
<br />~ I I
<br />I
<br />~ /1"\ I
<br />~
<br />~ , I B."'"" 1
<br /> I COSAVEH, ------- PGP ....VER. I
<br /> I ..... ~
<br />I I ~
<br /> srre AVER.
<br /> "\ ----- YEAAL y O,P, I
<br />~ ~ V PO AVER,
<br />f- I T1 SM.ORA/N r I AJ..FI>JJA I
<br />r:
<br />
<br />.
<br />,'''
<br />
<br />1990
<br />
<br />1902
<br />
<br />"..
<br />
<br />,9&
<br />
<br />BueIne. A......ge C.P, fab penoll (19M-19llil) at II ...lI1Ol"Itl:IrMlcr.....,.... Cl"lnCQ,
<br />SlteA.~. AAcn.geO.P.larlM11'fM1pcnodHs.......~ GOlII- elnctlrlldJC1c:nnt'-PpercoIIlllIt
<br />
<br />17
<br />
<br />'094
<br />
<br />~ N*l O,P,
<br />. BASELINE
<br />
<br />8 ""'"
<br />
<br />0& CDSA\IER
<br />C PGPAVER
<br />. PG$ AVER
<br />
<br />* Sl'1l! AVER
<br />
<br />CDS = Concr"te ditch wfsiphon tubas..
<br />PGP = pipe to gal8d pipe. PGS::. wrg.
<br />gltedpfpe
<br />
|