My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00528 <br /> <br />60 <br /> <br />. Project 8.11. Completion of Humpback Chub Action - Temperature Control Device <br />\ I <br /> <br />(. <br /> <br />.....-- .- <br /> <br />e <br /> <br />FUNDING <br />HISTORY Fiscal year <br /> 2001 2002 2004 2005 2006 <br />Outsourced <br />Science/Labor N/A N/A 105,000 104,187 188,680 <br />Loeistics N/A N/A 20,000 13 ,000 - <br />Operations N/A N/A 25,000 43,080 - <br />Salarv N/A N/A 50,000 16,430 - <br />Proiect Subtotal N/A N/A 176,679 188,680 <br />001 Customer <br />Burden (6%) N/A N/A 17,772 11 ,320 <br />Project Total N/A N/A 200,000 194,451 200,000 <br />% total <br />outsourced N/A N/A -60% -90% 100% <br /> <br />Principal Investigators: To be determined <br /> <br />Statement of Problem: A possible benefit to elevated release temperatures from Glen Canyon <br />Dam associated with a temperature control device is an increase in mainstem and nearshore <br />water temperature. These nearshore environments can serve as rearing habitat utilized by native <br />fishes. In addition to monitoring water temperature, it may also be important to monitor use of <br />these potential rearing habitats by native and non-native fishes. <br /> <br />Summary Project Description: The BuRec allocated $200,000 per year in FY 2004 and FY <br />2005 and possibly in FY 2006 to complete final compliance for the TCD as well as support <br />baseline monitoring of nearshore habitats prior to implementation of the TCD. We recommend <br />that whatever portion of these funds that are available following compliance be used to fund a <br />project to monitor key nearshore habitats near the Little Colorado River for both warming and <br />fish utilization. The BuRec has oversight on the funds and their allocation. <br /> <br />Implications of Experimental vs. Non-Experimental Budget: Outside Science/labor: 186,000 <br />subject to appropriated funds being available. Logistics: undemlined. Training/travel related <br />costs: N/A. Supplies/operations: undetermined. GCMRC salaries: undetermined. <br /> <br />,Need o.dJ ~, :n.~1 <br /> <br />de;:, c. ;.p+/.n- <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June to, 2005) <br />
The URL can be used to link to this page
Your browser does not support the video tag.