Laserfiche WebLink
<br />MO's and R1Ns addressed: 4.2. <br /> <br />Status/schedule: This project would begin in FY06 and be completed in FY07. <br /> <br />Implications of Experimental vs. Non-Experimental Budget: Outside Science/labor: <br />Reduced from previous effort to $100,000 Logistics: 30,000 for downstream work support. <br />Training/travel related costs: zero Supplies/operations: zero. GCMRC salaries: 14% of <br />terrestrial biologist time to assist with coordination. Under the "Non-Experimental" scenario, <br />this project would not be funded. <br /> <br />Expected ProductslDeliverables: <br />Draft and final report <br />Possible peer reviewed manuscript <br /> <br />Project B.7. Completion of Experimental Treatment - Mecbanical Removal of Non-Native <br />Fisbes in the Colorado River <br /> <br />FUNDING HISTORY Fiscal year <br /> 2002 2003 2004 2005 2006 <br />Outside GCMRC <br />Science/Labor N/A 130,000 130,000 160,000 240,000 <br />Logistics Field <br />SUDDort N/A 375,000 375,000 375,000 418,000 <br />Project Related <br />Travelffraininl' N/A - - - 0 <br />Operations/Sunnlies N/A 15,000 15,000 15,000 0* <br />GCMRC Salarv N/A 66,000 66,000 36,000 44,215 <br />Proiect Subtotal N/A - - - 702,215 <br />DOl Customer <br />Burden (6 to 17%) N/A - - - 92,977 <br />Project Total N/A 586,000 586,000 586,000 795,192** <br />% Total Outsourced N/A 54% 54% 59% 56% <br /> <br />.Operatlons cost for the project in FY06 .wllI be covered through the general lOgistiCS wlthm the proJect. <br />uProject total for mechanical removal in FY2006 is intended to reflect the actual proposed costs as determined by actual <br />expenditures in FY2005. <br /> <br />Principal Investigators: L. Coggins, U.S. Geological Survey (GCMRC), and B. Persons, <br />Arizona Game and Fish Department. <br /> <br />Statement of Problem: Trends in the abundance and recruitment of the Little Colorado River <br /> <br />population of humpback chub suggest this population has been in decline for over a decade. <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June 10,2005) <br /> <br />53 <br /> <br />. <br /> <br />, ' <br /> <br />. <br /> <br />. <br />