My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Ie <br /> <br />I. <br /> <br />, ,--..' <br /> <br />ie <br /> <br />00523 <br /> <br />50 <br /> <br />Integration: (Linkages downstream IQWP and with fishery life histories and ecosystem <br />dynamics, distribution and abundance of fishes relative physical habitat elements) <br /> <br />r~m..CrlY_~'~'{C~tlcurie1iTEs!i~it.~'of H urn I>hacKChub";NJiY.':-:ThiSp;:oj~t js_d.et:.q!:~~ <br />!Qjfyj!7 ! <br /> <br />Project B.s. Completion of Habitat Map & Inventory in Support of Monitoring <br /> <br />FUNDING <br />HISTORY Fiscal year <br /> 2002 2003 2004 2005 2006 <br />Outside GCMRC <br />Science/Labor - - - - - <br />Logistics Field <br />Support - - - - - <br />Project Related <br />TraveUTraininl! - - - - - <br />Operations/Supplies <br />GCMRC Salaries - - - - 14,215 <br />Proiect Subtotal - - - - 14,215 <br />DOl Customer <br />Burden (6 to 17%\ - - - - 2,417 <br />Project Total 70,650 88,000 - 16,632 <br />% Total <br />Outsourced 92% 88% 84% 0"/" 0% <br /> <br />Principle Investigators: 8. Ralston, GCMRCIVSGS, P. Davis USGS. <br /> <br />Statement of Problem: This project addresses recommendations made in the terrestrial, cultural <br />resource, and sediment protocol review reports. Terrestrial mapping of the Colorado River <br />corridor is required for spatial monitoring of physical, biological, and cultural resources. <br />Terrestrial mapping usually produces a digital terrain model (DTM) in combination with the <br />XYZ position of features and artifacts. Periodic mapping of the same areas can be used for <br />change detection ofresources. Attributes associated with a coverage type can also be used as a <br />predictive tool for monitoring and research. <br /> <br />Project Summary: This project is intended to measure, record and map terrestrial habitat <br />throughout the river ecosystem. These data will be related to available habitat relative to annual <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June 10, 2005) <br />
The URL can be used to link to this page
Your browser does not support the video tag.