Laserfiche WebLink
<br />43 <br /> <br />Implications of Experimental vs. Non-Experimental Budget: Surveys for KAS will only <br />occur once, in the fall in FY06. <br />Monitoring of Kanab ambersnails and utilized habitat, and southwestern willow <br />flycatcher breeding pairs: (I) is a compliance requirement and allows managers to assess the <br />status of this endangered species (2) provides data on the effect of periodic management of <br />sediment through high flows under the Record of Decision on the population dynamics and <br />habitat interactions of Kanab ambersnail. <br /> <br />. <br /> <br />Summary Project Description: To determine the extent of Kanab ambersnail habitat at Vaseys <br /> <br />Paradise and estimate the abundance of Kanab ambersnails at Vaseys Paradise. To determine the <br /> <br />presence of breeding pairs of southwest em willow flycatchers within the CRE. Specific <br /> <br />objectives of the project include: <br /> <br />. Provide habitat estimates and change detection of habitat of Kanab ambersnail for <br />varying stage levels. <br />. Provide yearly estimates of adult snails at Vascys Paradise <br />. Identify the location of breeding pairs of southwestern willow flycatchers. <br /> <br />i. <br /> <br />MO's and IN's ADDRESSED: Goal 5 and 6, MO's 5.1, 5.2,6.6,6.7; CMINs 5.1.1, 5.2.1, <br />6.7.1. <br /> <br />Status/Schedule: FYOI-05 - Initiated in its current design as a monitoring effort in FY 2001 <br /> <br />through a cooperative agreement with AGFD. A review of methodologies could take place in <br /> <br />FY06, pending availability of funds and staff time. Exploring altemative methodologies will be <br /> <br />delayed under this schedule until funds are available'. <br /> <br />Budget Changes: Outside Science/labor: Allocation is reduced by $20,000 and KAS surveys <br /> <br />are conducted once in the fall (AugusUScptember) of 2006. LogisJics: logistics is reduced by <br /> <br />$10,000, the cost of a trip. Training/travel related costs: reduced to zero. GCMRC salaries: <br /> <br />Reduced to cover 1 17th of terrestrial biologist time. <br /> <br />. <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June 10,2005) <br />