My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00518 <br /> <br />40 <br /> <br />.. <br /> <br />Recommended Approach / Methods: Standard GIS applications, plus customized <br /> <br /> <br />progranuning developed by the DASA coordinator intended to facilitate and expedite rapid <br /> <br /> <br />analysis of data collected by GCMRC science staff, cooperators and various contractors. <br /> <br />Status/Scbedule: Products to be delivered in FYs 2004-05. <br /> <br />Support for 2004 Experimental Analysis: Standard GIS and Oracle data applications will be <br />applied, as needed, to a variety of remotely sensed data sets collected in support of high-flow <br />experiments designed to test various sediment-conservation hypotheses. The GIS department <br />will also assist in directing data collection protocols of scientists prior to and during key <br />experimental treatments and will also assist in post-processing and analysis of experimental data <br />sets. <br /> <br />Implications of Experimental vs. Non-Experimental Scenarios: None here, as there is no <br />High-Flow Sediment Experimental treatment proposed. <br /> <br />I. <br /> <br />Project A.7. Completion of Channel-Mapping Project (DASA) - Remote-Sensing <br />Coordinator, (F.M Gonzales) <br /> <br />FUNDING HISTORY Fiscal year <br /> 2003 2004 2005 2006 <br />Outside GCMRC - <br />Science/Labor - - - - <br />Logistics Field - <br />Support - - - - <br />Project Related <br />Trainin~/Travel - - - - - <br />Operations/Supplies - - - - - <br />GCMRC Salaries - - - 28,100 - <br />Project Subtotal - - - 28,100 - <br />001 Customer <br />Burden (17%) - - - 4,777 - <br />Project Total - - - 32,877 - <br />% Total Outsourced - - - 0% - <br /> <br />e <br /> <br />Summary Project Description: This project is intended to provide full chmmel geometry map <br />coverage of the portions of the main channel between Glen Canyon Dam and Phantom Ranch. <br />The FY 2006 effort is intended to complete the channel mapping work that was initially started <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June to, 2005) <br />
The URL can be used to link to this page
Your browser does not support the video tag.