My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08865
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08865
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:49:56 PM
Creation date
10/12/2006 3:19:13 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.101.10.B
Description
Colorado River-Water Projects-Glen Canyon Dam/Lake Powell-Glen Canyon Adaptive Management-TWG
Basin
Colorado Mainstem
Water Division
5
Date
6/10/2005
Title
Fiscal Year 2006-Monitoring and Research Work Plan
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
184
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'. <br /> <br />;. <br /> <br />e <br /> <br />00510 <br /> <br />36 <br /> <br />Status/Schedule: FYO 1-03 - DBMS development produced the following datasets: Fish <br />Monitoring Data (1977 to present); Discharge unit values (1921 to present); Lake Powell water <br />quality (1986 to present); Sediment transport data (1921 to present); Water temperature <br />(downstream); Survey Control database. <br /> <br />FY04-06 - Develop applications to interact with database, set up database outside firewall for <br /> <br />extemal read-only access, conduct training sessions, manage (backup, re'cover, and tune), service <br /> <br />data requests, and continue developing schemas. <br /> <br />Expected Products/Deliverables: <br /> <br />. Integrated DBMS (Internal read-write database and extemal read-only. database) <br />. Applications for accessing both databases <br />. Documentation for backups, recoveries, DBMS daily tasks, and disaster recovery <br /> <br />Implications of Experimeutal vs. Non-Experimental Scenarios: None here, as there is no <br />High-Flow Sediment Experimental treatment proposed. <br /> <br />Project A.5b. Ongoing Data Conversion & Library Operations (DASA) - DASA <br />Coordinator and DASA Librarian (G. Bennett and S. Wyse), U.S. Geological Survey <br /> <br />FUNDING HISTORY Fiscal year <br /> 2002 2003 2004 2005 2006 <br />Outside GCMRC 0 15,249 0 17,000' 24,000' <br />Science/Labor <br />Logistics Field 0 0 0 0 0 <br />Support <br />Project Related - - - - 4,000 <br />Travelffraininl: <br />Operations/Supplies 18,000 29,000 39,000 39,000 29,250 <br />GCMRC Salaries 47,500 32,800 40,000 43,000 88,600' <br />Proiect Subtotal - - - - 145,850 <br />DOl Customer 22,155 <br />Burden (6 to 17%) - - - - <br />Project Total 65,500 77,049 79,000 99,000 168,005 <br />% Total Outsourced 0% 20% 0% 17% 14% <br /> <br />Student contractor fundmg for 2004 funded In 2003. <br />2This figure assumes an increase in pay rate for a student contractor with a bachelor's degree as well as additIOnal costs <br />of hiring through Northern Arizona University and other services. <br />3This figure renects the tolal salary ofGCMRC GIS and Database support (formerly, the Librarian), as well as 1/3 oflhe <br />Remote-Sensing Coordinator's salary 10 assist with analog~lo-dlgilal data conversion efforts. <br /> <br />GCMRC FY2006 Annual Work Plan (Draft, June 10,2005) <br />
The URL can be used to link to this page
Your browser does not support the video tag.